My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:11:40 PM
Creation date
3/15/2007 12:51:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pinelic•o Drive Turnout ar:rl Pipeline Prq%ect Er:vironrnentrr! Checklist <br />Santa Rita Road. "I'he control valve will have a 5,000 gpm maximum flow capacity and be <br />controlled remotely. Two isolation valves will be located upstream and downstream of the <br />control valve. A slow meter will also be housed in the vault. The vault will be covered with <br />locking double leaf hatch. <br />The Santa Rita control valve vault will be controlled by a programmable logic controller <br />(PLC), with data telemetered via 2.5 GIIz spread-spectrum radio to the City of Pleasanton's <br />Operations Control Center. The high radio frequency transmission system will require an <br />approximately 20 to 25 foot high radio antenna located adjacent to the vault. <br />Construction Schedule <br />The anticipated duration of construction activities for the proposed project is approximately 28 <br />weeks with certain activities occurring concurrently. General durations of construction include: <br />• start up activities, 11 weeks; <br />• installation of the pipeline, 4 weeks; <br />• installation of the 'Lone 7 turnout and City of Pleasanton vault, 2 weeks; <br />• construction of the fluoridation building, 5 weeks; <br />• installation of the Santa Rita control valve vault, 2 weeks; and <br />• equipment testing and decommissioning, 4 weeks. <br />Constntctron-Related Activities <br />Construction will follow the City of Pleasanton's Standard Specifications for materials and <br />methods of construction for the City's public infrastnrcture (City of Pleasanton 2002). These <br />specifications address landscaping, construction near trees, traffic control, erosion and <br />sedimentation control, good housekeeping practices including hazardous materials transport, <br />storage and use, construction hours and schedule, and procedures if archeological artifacts are <br />encountered during construction. <br />Installation of project facilities will require excavation, grading and backtilling. Approximately <br />150 cubic yards of material will be excavated to install the Zone 7 turnout, City of Pleasanton <br />vault, fluoridation building and Santa Rita control valve vault. The pipeline will be installed <br />under Pimlico and Brockton drives using traditional cut and cover construction methods. <br />Approximately 1,800 to 3,600 cubic yards of material will be excavated and excess material <br />harried offsite and will not be stored along the pipeline construction route. Excess material will <br />be disposed of at a suitable landfill site. Bedding and backfill material will be trucked to the <br />construction site. "I'he work space along Pimlico and Brockton drives will be about 30-feet wide <br />and some traffic lane closures will be necessary, however, at least one lane will be remain open <br />for traffic and a traffic control plan will be prepared and approved by the City of Pleasanton prior <br />to construction. <br />The typical crew size for pipeline installation will include 4 to 6 workers, 3 to 4 truck drivers and <br />inspectors. Truck traffic generated by workers coming to and from the construction site daily <br />will include 6 to 8 at the pipeline construction site, 6 to 8 at the Zone 7 turnout and Pleasanton <br />City of Pleasanton 9 Winzlcr & Kelly <br />Draft Initial Study/Proposed Negative Declaration August 2006 <br />04263501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.