My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 17 of 18 <br />saruer Erlgla~2rl~g <br />CONSTRUCTION MANAGER, the City of Pleasanton and the ENGINEER work <br />together, etc. Because many of these factors are beyond the control of Garber <br />Engineering, the limits given in the Table of Compensation are notification limits. <br />When, and if, the total fees charged to a task equal or exceed seventy five percent <br />(75%) of the notification limit for the task at the time of the monthly billing, Garber <br />Engineering will contact the City of Pleasanton to discuss the matter. The <br />discussion will cover the likelihood of the notification limit being exceeded and the <br />best manner to proceed. Garber Engineering will not bill more than the notification <br />limit without written permission to do so from the City of Pleasanton. <br />Garber Engineering believes that the notification limits given in the Table of <br />Compensation should be adequate under most circumstances. The actual fee may <br />be well under the notification limits. Please be aware, however, that Garber <br />Engineering does not warrant that it can complete all work described in the Scope <br />of Work under all circumstances. If various difficulties beyond Garber <br />Engineering's control cause the billings to reach the notification limits and the City <br />of Pleasanton decides that the billing limits should not be increased to a level <br />which will allow completion of the work, Garber Engineering will only perform <br />work until the agreed upon billing limits are reached, whether or not the work <br />described in the Scope of Work is complete <br />Time and materials fees are based on the attached Rate Schedule. <br />WATER BOOSTER PUMP STATION <br />Electrical Engineering <br />Structural Engineering <br />Time and Materials to a Notification Limit of $22,500 <br />Time and Materials to a Notification Limit of $19,800 <br />Mechanical and Civil Engineering <br />Time and Materials to a Notification Limit of $28,500 <br />ZONE 7 TURNOUT #6 <br />Electrical Engineering <br />Time and Materials to a Notification Limit of $2,800 <br />C Documents end seningsVNm~hea Gaber~M~ Oommems~PROACOPnI¢~COPUn2 PUn7, Hpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.