My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 16 of 18 <br />Garber E~glo~ermg <br />B. The CONSTRUCTION MANAGER or the City of Pleasanton will <br />work with the CONTRACTOR to make sure that the <br />CONTRACTOR fulfills his obligations under SECTION 01782 of <br />the CONTRACT SPECIFICATIONS and maintains a set of up-to- <br />date markups of the plans onsite. <br />C. The CONTRACTOR will hand over a complete set of final record <br />drawing markups complying with SECTION 01782 of the <br />CONTRACT SPECIFICATIONS. The drawings will have a <br />complete and legible set of all changes to the project. <br />2. Garber Engineering will use the CONTRACTOR'S markups (provided in <br />compliance with SECTION 01782 of the CONTRACT SPECIFICATIONS) <br />to make modifications to the CONTRACT DRAWINGS to show what was <br />actually installed and constructed. <br />3. Garber Engineering will provide the record drawings in the following <br />formats: <br />A. One set of stamped bond drawings. <br />B. AutoCAD. <br />C. Potable Document Format (.pdf) <br />4. Garber Engineering will only be responsible for including the changes <br />shown on the CONTRACTOR'S markups. <br />TABLE OF COMPENSATION <br />The Table of Compensation is based on the Scope of Work, assumptions and <br />Exclusions given in this proposal. If the Scope of Work, assumptions or <br />Exclusions presented in this proposal prove to be incorrect, it may be necessary to <br />modify the notification limits in the Table of Compensation. <br />Please note that construction phase engineering is subject to a good deal of <br />uncertainty. The amount of engineering work required during the construction <br />phase is dependent on several factors including: how well the CONTRACTOR <br />complies with the intent of the CONTRACT DOCUMENTS, how the <br />CONSTRUCTION MANAGER and City of Pleasanton interpret the CONTRACT <br />DOCUMENTS and utilize the ENGINEER, how well the CONTRACTOR, the <br />C \Docwnems and Seumg>\Manhex Gwber\Mr Docwnems\PROJ\COPnU2\COPaU2.PU0'_.xpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.