My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 18 of 18 <br />Garter Erfgloe2rhg <br />Mechanical and Civil Engineering <br />Time and Materials to a Notification Limit of $8,000 <br />EXCLUSIONS <br />Construction phase services related to Geotechnical Engineering. <br />2. Construction phase services related to Architectural Design. <br />3. Construction phase services related to Landscape Architecture. <br />Please review this scope of work and information and let me know if it is suitable. <br />If we may be of any further assistance regarding this matter, please contact me. <br />Very truly yours, <br />GARBER ENGINEERING <br />Matthew Garber <br />Owner <br />C\DOCUrtlenls and SeuingsVNerlhex GarberVNy Uocwnenls\PROI\COPOI1PCOplll12. P1102.xpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.