Laserfiche WebLink
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 15 of 18 <br />sarrler Erlgloe2rmg <br />9. At the request of the City of Pleasanton or the CONSTRUCTION <br />MANAGER, Garber Engineering and/or its subconsultants will provide to <br />the City of Pleasanton and the CONSTRUCTION MANAGER a brief <br />memo summarizing the purpose and results of each quality control/quality <br />assurance site visit. <br />10. Garber Engineering and/or its subconsultants will assist the City of <br />Pleasanton in preparing a written set of test procedures to be used near the <br />completion of the project to have the CONTRACTOR demonstrate that the <br />pump station and related systems function as intended. <br />11. Garber Engineering and/or its subconsultants will witness the startup <br />testing. During the testing, Garber Engineering will provide clarification of <br />the portions of the test procedures with which they are familiar, record <br />which items of the test procedures have been successfully passed and which <br />have not. <br />12. Garber Engineering and/or its subconsultants will provide to the City of <br />Pleasanton and the CONSTRUCTION MANAGER a brief memo <br />summarizing what they witnessed at the startup testing. <br />13. Any visits or meetings by Garber Engineering and/or its subconsultants are <br />only to provide an additional level of comfort that the CONTRACTOR is <br />generally conforming with the design concept of the project and with the <br />information given in the CONTRACT DOCUMENTS. Garber Engineering <br />and its subconsultants cannot provide this assurance for portions of the <br />WORK which Garber Engineering and its subconsultants did not see or <br />were not informed about. Any visits or meetings by Garber Engineering <br />and/or its subconsultants do not relieve CONTRACTOR of any of his <br />responsibility for the successful completion of the WORK in conformity <br />with the requirements of the CONTRACT DOCUMENTS. <br />PREPARE RECORD DRAWINGS <br />Assumptions: <br />A. The CONTRACTOR will fulfill his obligations under SECTION <br />01782 of the CONTRACT SPECIFICATIONS and maintain a set of <br />up-to-date markups of the plans onsite. <br />C \Documens end Sevings\MaVhex GerberVNc Documents\PROI\COPU02\COPU02.PnU? xpd <br />