My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 14 of 18 <br />saro~r Erlglo~2rlag <br /> Garber Engineering ECS Engineering <br />Kickoff Meeting 1 0 <br />Construction Meetings 1 1 <br />QA/QC Visits 1 1 <br />Startu Witness 1 1 <br />2. Garber Engineering will attend the project kickoff meeting. <br />3. At the project kickoff meeting Garber Engineering will discuss its role in <br />the project including shop drawing submittals, meetings, answering <br />construction related questions, witnessing startup and production of record <br />drawings. <br />4. At the request of the City of Pleasanton, Garber Engineering and/or its <br />subconsultants will attend construction meetings, attend quality <br />control/quality assurance site visits or witness the startup and performance <br />tests related to the project as requested by the City of Pleasanton. <br />5. Garber Engineering and/or its subconsultants will discuss the project, status <br />of the project and other matters related to the project at the construction <br />meetings. <br />6. Garber Engineering and/or its subconsultants will follow up on items and <br />perform tasks as agreed to at the construction meetings. <br />7. At the request of the City of Pleasanton, Garber Engineering and/or its <br />subconsultants will visit the construction site in a quality control/quality <br />assurance capacity. These scope of those visits will be limited to the <br />portion of the WORK that the City of Pleasanton or the CONSTRUCTION <br />MANAGER wishes viewed and which is visible to Garber Engineering <br />and/or its subconsultants at the time of the site visit. <br />8. During or after quality control/quality assurance site visits, Garber <br />Engineering and/or its subconsultants will point out areas which do not <br />comply with the CONTRACT DOCUMENTS and which are apparent to <br />Garber Engineering and/or its subconsultants. <br />C \Documents wd Settings\hla~thex Garber6Nr Ooeuments\PROJ\COPIIIp\COPn02.P1\02xpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.