My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GarG2r E~gM~~2rhg <br />Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page l3 of 18 <br />4. Garber Engineering will coordinate with its subconsultants and work to <br />make the portions of the change orders that it is issuing are consistent and <br />complete. <br />5. The technical portions of the change orders will be issued to the City of <br />Pleasanton in hard copy form and Microsoft Word format or AutoCAD <br />format as needed. <br />ATTEND MEETINGS <br />Assumptions: <br />A. The City of Pleasanton will provide any day to day construction <br />supervision, day to day inspection or Special Inspection (as defined <br />in Section 1701 of the Uniform Building Code /California Building <br />Code) that is required by code or statute or desired by the City of <br />Pleasanton. <br />B. Neither Garber Engineering nor its subconsultants will be <br />performing supervision of construction or any long term on-site <br />inspection. Special Inspection, as defined in Section 1701 of the <br />Uniform Building Code /California Building Code will not be <br />performed by Garber Engineering or its subconsultants. <br />C. Meetings will be at the construction site or other locations within <br />Pleasanton. <br />D. Garber Engineering and its subconsultants will not attend every <br />construction meeting related to the project. <br />E. The number of meetings will not exceed that shown in the table <br />below: <br />C ~Docvmems and Snu~gs~Alatthea GerberVNc OocwnemsNRO1\COPP02\COPiIlidPU02 wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.