Laserfiche WebLink
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 12 of 18 <br />Garber Erlgloa2n~g <br />3. If required, Garber Engineering will distribute the questions to various <br />subconsultants such as the electrical engineer or to any suppliers who may <br />have knowledge to help respond to the questions. <br />4. Garber Engineering will receive any responses from the electrical engineer, <br />the structural engineer or suppliers and integrate these responses into a <br />coordinated response. <br />5. Garber Engineering will make a judgement regarding the need to document <br />any questions and responses. Most questions and responses will be <br />documented but the response to some minor questions may be solely verbal. <br />Documentation will consist of written records of the question and the <br />response. Documentation will be distributed to the CONTRACTOR, City <br />of Pleasanton, CONSTRUCTION MANAGER and any subconsultants who <br />may have contributed to the response. <br />ASSIST IN ISSUING CHANGE ORDERS <br />Assumptions: <br />A. Others will be responsible for the portions of any change order that <br />are not technical in nature. <br />B. Others will be responsible for assembling any change orders. <br />C. Others will be responsible for distributing any change orders. <br />2. [f in the course of construction, it becomes necessary to issue a change <br />order or change orders, Garber Engineering will prepare the portions of the <br />change orders which are technical in nature. That is, the portions of the <br />CONTRACT DRAWINGS and CONTRACT SPECIFICATIONS that need <br />to be modified will be updated and a detailed list of the existing specific <br />SECTIONS of the CONTRACT SPECIFICATIONS and portions of the <br />CONTRACT DRAWINGS which are superseded or modified by the <br />change order. <br />3. Garber Engineering will communicate with the various parties to determine <br />what the change order needs to cover and how to make the appropriate <br />changes. <br />C\DOCUmmts and SeningsVNe~New Garber\My Uocumems\PRU]\COPUOPCOPOU2.PU02 wpd <br />