Laserfiche WebLink
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 1 l of 18 <br />saner E~glrta2rlog <br />9. Contact those who have generated inconsistent comments (if any) facilitate <br />a consistent set of comments. <br />10. Compile a final coordinated response to each given submittal incorporating <br />and including the input from each reviewer and return responses to the <br />CONTRACTOR with copies to the City of Pleasanton, and any others who <br />may have reviewed the submittal. <br />1 1. Please note that review of shop drawings is only for general conformance <br />with the design concept of the project and general compliance with the <br />information given in the CONTRACT DOCUMENTS. Review and <br />approval of the CONTRACTOR'S shop drawings shall not relieve <br />CONTRACTOR of any of his responsibility for the successful completion <br />of the WORK in conformity with the requirements of the CONTRACT <br />DOCUMENTS. The CONTRACTOR is responsible for conformance with <br />all requirements of the CONTRACT DOCUMENTS. Approval of shop <br />drawings shall not waive any requirement of the CONTRACT <br />DOCUMENTS and defective work may be rejected notwithstanding such <br />approval. <br />12. The number of submittals discussing new topics will be no more than the <br />number of submittals listed in PARAGRAPH 01340 1.10 D of the <br />CONTRACT SPECIFICATIONS. <br />13. The not to exceed limit listed in the table of compensation above is based <br />on an average of two iterations of each shop drawing submittal being <br />submitted by the CONTRACTOR. <br />RESPOND TO CONSTRUCTION RELATED QUESTIONS <br />Assumptions: <br />A. The questions will come from the CONTRACTOR or City of <br />Pleasanton. Questions from others will only be answered if the City <br />of Pleasanton agrees that the questions need answering. <br />2. Garber Engineering will receive and respond to engineering related <br />questions and other questions related to interpretations and explanations of <br />the CONTRACT DOCUMENTS. <br />C\Documenls end SetOnysVNe\Nex Garber\M~- Uocumems\PROJ\COPOIIPCOPO~Y1 P00'_ xpd <br />