Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 8 of 18 <br />Assumptions: <br />saner E~gioe2n~g <br />A. The CONTRACTOR will fulfill his obligations under SECTION <br />01782 of the CONTRACT SPECIFICATIONS and maintain a set of <br />up-to-date markups of the plans onsite. <br />B. The CONSTRUCTION MANAGER will work with the <br />CONTRACTOR to make sure that the CONTRACTOR fulfills his <br />obligations under SECTION 01782 of the CONTRACT <br />SPECIFICAT[ONS and maintains a set of up-to-date markups of the <br />plans onsite. <br />G The CONTRACTOR will hand over a complete set of final record <br />drawing markups complying with SECTION 01782 of the <br />CONTRACT SPECIFICATIONS. The drawings will show a <br />complete and legible representation of all changes to the project. <br />2. Garber Engineering and its subconsultants will use the CONTRACTOR'S <br />markups (provided in compliance with SECTION 01782 of the <br />CONTRACT SPECIFICATIONS) to make modifications to the <br />CONTRACT DRAWINGS to show what was actually installed and <br />constructed. <br />3. Garber Engineering will provide the record drawings in the following <br />formats: <br />A. One set of stamped bond drawings. <br />B. AutoCAD. <br />C. Potable Document Format (.pdf) <br />4. Garber Engineering and its subconsultants will only be responsible for <br />including the changes shown on the CONTRACTOR'S markups. <br />C\Documems and SevingsVNe~~heti GarberVNc Documents~PR01\COPUUPCOPao2 PUO7. xpd <br />