My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
032007
>
REGULAR MEETING
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2007 1:12:06 PM
Creation date
3/15/2007 12:47:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 7 of 18 <br />salrler Erlglrt~2rmg <br />MANAGER wishes viewed and which is visible to Garber Engineering <br />and/or its subconsultants at the time of the site visit. <br />8. During or after quality control/quality assurance site visits, Garber <br />Engineering and/or its subconsultants will point out areas which do not <br />comply with the CONTRACT DOCUMENTS and which are apparent to <br />Garber Engineering and/or its subconsultants. <br />9. At the request of the City of Pleasanton or the CONSTRUCTION <br />MANAGER, Garber Engineering and/or its subconsultants will provide to <br />the City of Pleasanton and the CONSTRUCTION MANAGER a brief <br />memo summarizing the purpose and results of each quality control/quality <br />assurance site visit. <br />10. Garber Engineering and/or its subconsultants will assist the City of <br />Pleasanton in preparing a written set of test procedures to be used near the <br />completion of the project to have the CONTRACTOR demonstrate that the <br />pump station and related systems function as intended. <br />11. Garber Engineering and/or its subconsultants will witness the startup <br />testing. During the testing, Garber Engineering will provide clarification of <br />the portions of the test procedures with which they are familiar, record <br />which items of the test procedures have been successfully passed and which <br />have not. <br />12. Garber Engineering and/or its subconsultants will provide to the City of <br />Pleasanton and the CONSTRUCTION MANAGER a brief memo <br />summarizing what they witnessed at the startup testing. <br />13. Any visits or meetings by Garber Engineering and/or its subconsultants are <br />only to provide an additional level of comfort that the CONTRACTOR is <br />generally conforming with the design concept of the project and with the <br />information given in the CONTRACT DOCUMENTS. Garber Engineering <br />and its subconsultants cannot provide this assurance for portions of the <br />WORK which Garber Engineering and its subconsultants did not see or <br />were not informed about. Any visits or meetings by Garber Engineering <br />and/or its subconsultants do not relieve CONTRACTOR of any of his <br />responsibility for the successful completion of the WORK in conformity <br />with the requirements of the CONTRACT DOCUMENTS. <br />PREPARE RECORD DRAWINGS <br />C\Documems and SeltingsVNe~~heti Gorber\Mv Documems\PROI\COPrni2\COPU12.POU2.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.