Laserfiche WebLink
Vineyard Ave Water Booster Pump Station and Zone 7 Turnout # 6 <br />Construction Phase Engineering Proposal <br />March 9, 2007 <br />Page 6 of 18 <br />saner Erlgloa2rlag <br />D. Garber Engineering and its subconsultants will not attend every <br />construction meeting related to the project. <br />E. The number of meetings will not exceed that shown in the table <br />below: <br /> Garber <br />Engineering ECS Engineering TJC & Associates <br />Kickoff Meeting 1 1 0 <br />Construction <br />Meetings 4 5 2 <br />QA/QC Visits 2 4 l <br />Startu Witness 2 2 0 <br />2. Garber Engineering and its subconsultants will attend the project kickoff <br />meeting. <br />3. At the project kickoff meeting Garber Engineering and its subconsultants <br />will discuss their role in the project including shop drawing submittals, <br />meetings, answering construction related questions, witnessing startup and <br />production of record drawings. <br />4. At the request of the City of Pleasanton, Garber Engineering and/or its <br />subconsultants will attend construction meetings, attend quality <br />control/quality assurance site visits or witness the startup and performance <br />tests related to the project as requested by the City of Pleasanton. <br />5. Garber Engineering and/or its subconsultants will discuss the project, status <br />of the project and other matters related to the project at the construction <br />meetings. <br />6. Garber Engineering and/or its subconsultants will follow up on items and <br />perform tasks as agreed to at the construction meetings. <br />7. At the request of the City of Pleasanton, Garber Engineering and/or its <br />subconsultants will visit the construction site in a quality control/quality <br />assurance capacity. These scope of those visits will be limited to the <br />portion of the WORK that the City of Pleasanton or the CONSTRUCTION <br />C \Documents end SemngsV.latlhew GerbedM~ UocwnemsN201\COPOn2\COPOo2 Pno2 apd <br />