Laserfiche WebLink
<br />Pleasanton Gateway Environmental Checklist <br /> <br />16. UTILITIES AND SERVICE SYSTEMS <br /> <br />Environmental Setting <br /> <br />The City of Pleasanton has public services and infrastructure planned to meet the build out of the Gen- <br />eral Plan, implemented by the Growth Management Plan. <br /> <br />Standards of Significance <br /> <br />For purposes of this environmental document, an impact is considered significant if the proposed project <br />would: <br /> <br />. Result in the construction of new water facilities or expansion of existing facilities; <br />. Result in exceeding the wastewater treatment requirements of the Regional Water Quality Con- <br />trol Board; <br />. Result in or require the construction or expansion of existing wastewater treatment facilities; <br />. Be served by a landfill that has inadequate permitted capacity. <br /> <br /> I.c55 Than <br /> Potentially Significant Less Than <br /> Significant With Mitigation Significant No <br />Issues Impact Incorporated Impact Impact <br />Utilities and Service Svstems <br />Would the project: <br />a) Exceed wastewater treatment requirements of the ap- D D [KJ D <br /> plicable Regional Water Quality Control Board? <br />b) Require or result in the construction of new water or D D [K] D <br /> wastewater treatment facilities or expansion of existing <br /> facilities, the construction of which could cause sig- <br /> nificant environmental effects? <br />c) Require or result in the construction of new storm wa- D D [K] D <br /> ter drainage facilities or expansion of existing facili- <br /> ties, the construction of which could cause significant <br /> environmental efTects? <br />d) Have sufficient water supplies available to serve the D D [K] D <br /> project from existing entitlements and resources, or are <br /> new or expanded entitlements needed? <br />Discussion <br /> <br />a,b,d) The proposed project will not exceed projected wastewater treatment requirements and there are <br />sufficient water supplies available to serve the project. Therefore, this would be a less titan sig- <br />nificant impact. <br /> <br />Pleasanton Gateway Initial Study <br /> <br />Page 35 of 37 <br /> <br />November 8, 2006 <br />