My WebLink
|
Help
|
About
|
Sign Out
12 Exhibits
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
022007
>
12 Exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2007 3:42:28 PM
Creation date
2/15/2007 3:32:05 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/20/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
12 Exhibits
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />. .' <br /> <br />~..-;. <br />I <br /> <br />Figure 11: Home Depot Site and thc Iron Horse Trail Alignment <br /> <br />This interim alignrnent requires thrce roadway crossings and staff gave consideration to elimi- <br />nating two of these three crossings by adding a crosswalk along thc cast side of the Stanley <br />Boulevard/Valley Avenue/Bernal Avenue intersection. Adding the surface-level pedestrian <br />crossing to the east leg of this intersection, however, will adds signiticant delay to the intersec- <br />tion, as additional time is requircd to accommodate the new pedestrian rnovement. This added <br />delay would make future coordination of Stanley Boulevard irnpossiblc and reduce the level of <br />service to an unacceptable level. <br /> <br />The ultimate design of the Iron Horse Trail is to mirror the original intent of the Community <br />Trails Master Plan by extending the trail to the east along the north side of Stanley Boulevard <br />where an ultirnate trail crossing to the south side could be completed at Shadow Cliffs signalized <br />intersection. This ultimate trail design shall be incorporated into the East Side Specific Plan. <br />Until the time that this specitic plan is cornp1cted and in place, the interim trail alignment will <br />remain. Staff notes that a crosswalk would be painted to cross the north side of the Stanley <br />Boulevard/Valley Avenue/Bernal Avenue intersection for the trail users that do not cross at <br />Boulder Street. <br /> <br />PCUP-165/P DR-529/PMOD-8/-25-7M <br /> <br />Page 26 of48 <br /> <br />December 13, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.