Laserfiche WebLink
TABLE 1 <br />Shared Infrastructure Improvement Components and Estimated Costs <br />a 1 -Includes Lots 1-171ocated in the western portion of the Vineyard Avenue Corridor area. <br />Infrastructure Type of Improvement Estimated <br />Component Cost <br />Sewer Twelve-inch replacement trunk line from Bemal Avenue to $430.000 <br /> Tioga Court <br />Sewer Ten-inch trunk line from Tioga Court to the southwest comer $200,000 <br /> of Lot 8 at Vineyard Avenue <br />Roadway Sidewalk (including retaining wall) along the south side of $180,000 <br /> Vineyard Avenue from the western border of Lot 1 to Lot 15 <br />part 2 -Includes Lots 22-24 located south of the existing Vineyard Avenue in the center of the <br />Vineyard Cotridor area. <br />Infrastructure Type ofImprovement Estimated Cost <br />Component <br />Water Sixteen-inch water trunk line within the existing $960,000 <br /> Vineyard Avenue, and Zone 7 Tum-out #6 <br /> modifications <br />Sewer Sewer pump station and force main $520.000 <br />Part -Includes Lot 18 located north of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor Area. <br />Infrastructure Type of Improvement Estimated Cost <br />Component <br />Sewer Eight-inch sewer trunk line within the reali};ned $160,000 <br /> Vineyard Avenue from the new pump station to the <br /> east end of Lot r 8 <br />Roadway Realignment of Vineyard Avenue from the east end of $1,500.000 <br /> the "S"-curve to the east end of Lot 18 <br />Storm Water Outfall at Lot 18 $21,000 <br />Detention <br />