My WebLink
|
Help
|
About
|
Sign Out
20A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
20A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 1:15:40 PM
Creation date
2/1/2007 4:10:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
20A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br />Shared Infrastructure Improvement Components and Estimated Costs <br />a 1 -Includes Lots 1-171ocated in the western portion of the Vineyard Avenue Corridor area. <br />Infrastructure Type of Improvement Estimated <br />Component Cost <br />Sewer Twelve-inch replacement trunk line from Bemal Avenue to $430.000 <br /> Tioga Court <br />Sewer Ten-inch trunk line from Tioga Court to the southwest comer $200,000 <br /> of Lot 8 at Vineyard Avenue <br />Roadway Sidewalk (including retaining wall) along the south side of $180,000 <br /> Vineyard Avenue from the western border of Lot 1 to Lot 15 <br />part 2 -Includes Lots 22-24 located south of the existing Vineyard Avenue in the center of the <br />Vineyard Cotridor area. <br />Infrastructure Type ofImprovement Estimated Cost <br />Component <br />Water Sixteen-inch water trunk line within the existing $960,000 <br /> Vineyard Avenue, and Zone 7 Tum-out #6 <br /> modifications <br />Sewer Sewer pump station and force main $520.000 <br />Part -Includes Lot 18 located north of the existing Vineyard Avenue in the center of the <br />Vineyard Corridor Area. <br />Infrastructure Type of Improvement Estimated Cost <br />Component <br />Sewer Eight-inch sewer trunk line within the reali};ned $160,000 <br /> Vineyard Avenue from the new pump station to the <br /> east end of Lot r 8 <br />Roadway Realignment of Vineyard Avenue from the east end of $1,500.000 <br /> the "S"-curve to the east end of Lot 18 <br />Storm Water Outfall at Lot 18 $21,000 <br />Detention <br />
The URL can be used to link to this page
Your browser does not support the video tag.