Laserfiche WebLink
Part 4 -Includes Lots 19 (planned partially for the school site), 20.21, and 25-33 located in the <br />eastem portion of the Vineyazd Corridor area. <br />Infrastructure Type of Improvement Estimated Cost <br />Component <br />Sewer Eight-inch sewer trunk line within the realigned $200,000 <br /> Vineyard Avenue from the east end of Lot I S to the <br /> eastem boundary of the Specific Plan Area <br />Roadway Realignment of Vineyard Avenue from the east end of $1,870,000 <br /> Lot 18 to the eastem Specific Plan Area boundary, and <br /> trail and landscape improvements to the existing <br /> Vineyard Avenue section between the northwest comer <br /> of Lot 8 ("S"-curve} and the eastem border of the Plan <br /> Area <br />Storm Water All planned storm water detention facilities east of $651,000 <br />Detention Lot 18, plus outfall at Lot 32 <br />Part - Relates to all lots within the Specific Plan Area (Lots 1-33). Part 5 consists of all of the <br />"non-minimum" shared infrastructure improvements. <br />Infrastructure Type of Improvement Estimated Cost <br />Component <br />Water Water tank, supply line, and pump station $ I ,900,000 <br /> reimbursement to City (improvements to be <br /> constructed at such time as considered to be necessary <br /> by the City <br />Utility Utilities undergrounding along the Lot 18 frontage of $1,260.000 <br />Undergrounding the existing Vineyard Avenue <br />Specific Plan Reimbursement of Specific Plan consultant fees $250,000 <br />Preparation to the City <br />Vista Diablo Reimbursement for $10,340 shared water $ 10,340 <br />Water improvements <br />Reimbursement <br />Vista Diablo Reimbursement for $285,579 shared roadway $285.579 <br />Roadway improvements to Vineyard Avenue <br />Reimbursement <br />