My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
020607
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2007 4:16:04 PM
Creation date
2/1/2007 3:55:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/6/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mike Fulford <br />Landscape Architectural Services for West Las Positas Boulevard Median Landscaping <br />November 1. 2006 <br />D. CONSTRUCTION PLAN: <br />We will prepare plans that locate all proposed improvements identified in the approved <br />Master Plan, and establish their horizontal layout such as paving and planting areas. <br />Grading information, if required, will be documented on these plans. <br />E. CONSTRUCTION DETAILS: <br />We will provide plans, sections and elevations of the individual elements of the <br />Construction Plan. <br />F. IRRIGATION PLAN: <br />We will lay out all piping, valves, sprinklers, controllers, backflow preventers, and quick <br />coupler outlets, for irrigation of all new planting areas, and as required to connect to the <br />existing irrigation system. We will establish and document the necessary electrical <br />service for the irrigation system. We will also provide details as required. <br />G. PLANTING PLAN: <br />We will identify all proposed plant locations and items of plant material to be used and <br />any existing vegetation to be preserved. A plant list, including quantities, sizes, and <br />varieties of all materials will appear on the drawing. We will also provide details as <br />required. <br />H. SPECIFICATIONS: <br />We will prepare specifications to identify all types and qualities of materials to be used, <br />and will set forth explicit and concise methods of construction and/or installation. The <br />specifications will establish the quality and character of the finished work. These <br />specifications will be formatted to conform to City of Pleasanton standards. <br />MEETINGS: <br />During the Construction Document phase of work, we will meet with you and/or others up <br />to three (3) times under your direction to resolve project issues. <br />PHASE III: BIDDING <br />Upon issuance of the bid documents, we will assist you during the bidding phase as follows: <br />J. BIDDING: <br />Bidding will include the following items of work: <br />a. We will assist you to assemble a bid package using the City's standard general <br />requirements. <br />b. We will assist you in preparing drafts of addenda or clarifications. <br />c. We will review and evaluate bids where they pertain to the work related to our <br />documents. <br />d. We will attend one pre-bid meeting if required. <br />K. CONSTRUCTION MONITORING: NOT INCLUDED <br />2. COMPENSATION <br />A. FEES: <br />Fees for the work listed above will be as follows: <br />Fee Descri ton Fee Amount <br />PROFESSIONAL FEES $ 47,000 <br />REIMBURSABLE EXPENSES $ 3,000 <br />TOTAL FEES $ 50,000 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.