My WebLink
|
Help
|
About
|
Sign Out
25A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
011607
>
REGULAR MEETING
>
25A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2007 12:10:43 PM
Creation date
1/12/2007 11:04:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
25A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ALLOCATION OF COSTS <br /> <br />The basic principles in the Specific Plan are as follows: <br />· each planned new housing unit shall share equally with all others in the <br />construction of the shared infrastructure; <br />· each existing housing unit shall share equally with new units for the new <br />infrastructure it uses; and <br />· non-residential uses shall share equally with the residential units based on the <br />intensity of their use of the infrastructure. <br />These principles will be implemented over time by adhering to the provisions of this <br />Financing Program. . <br /> <br />Financing Program #4. Each Lot is allocated its pro rata share of the total shared <br />infrastructure improvements based on the assumed development both within and outside <br />of the Specific Plan Area which contribute to the need for the shared infrastructure <br />improvements. <br /> <br />(a) Lot shares for each Lot in the Specific Plan Area are shown in Table 2. <br />The total shares shown in Table 2 for each Lot are fixed; no modification <br />to Table 2 or any Lot's pro rata share will be made notwithstanding <br />whether: <br /> <br />(i) the Lot is actually developed with fewer final lots than assumed in <br />the Specific Plan; or <br />(ii) the Lot is developed with another use allowed in the Specific Plan <br />which may have different infrastructure impacts (e.g.. church. day <br />care center. etc.). <br /> <br />(b) Out-of-area contributors are.projects which have been determined. or may <br />be in the future. to contribute to the need for, and benefit from, the shared <br />infrastructure improvements. Shares attributed to out-of-area contributors <br />are shown in Table 2. <br /> <br />(i) Ruby Hill: assigned a total share of road costs equal to 40% of the <br />Specific Plan Area roadway costs. (Ruby Hill has constructed <br />road, water line, and sewer shared infrastructure improvements for <br />which it will receive a credit toward its total obligation. Payment <br />of its remaining obligation will be in accordance with a subsequent <br />agreement to be reached between Signature Properties and the <br />City.) Ruby Hill is not assigned EDUs 3! se; the total roadway <br />cost to Plan Area properties has been reduced by the amount of <br />Ruby HiJrs contribution. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.