Laserfiche WebLink
<br />Financing Program #2. Upon approval of a tentative map. the City may allow panial <br />infrastructure extensions within Parts I, 2. and 3 if: <br /> <br />(a) the Lot to be developed would be fully served with all planned <br />infrastructure extended from the westerly end of the Plan Area: and <br /> <br />(b) the total Specific Plan fees generated by the Lot to be developed are <br />insufficient, when aggregated with momes in the Specific Plan fund. to <br />allow all infrastructure required in that sub-area to be fully installed. <br /> <br />Examole 2 A. LollO is Ihe firsllol wishing 10 develop. II must extend the Part I <br />Infrastructure from Ihe westerly end of the Plan Area across Ilsfromage. Lot <br />10 's four units do nol generale funds sufficient 10 extend the i'!frastntc/Ure .furlher <br />(there being no existing Specific Plan funds). The Part 1 sewer and roadway <br />improvemenls may stop at Lot 10 and need not be installed easterly to LOI 15. the <br />easterly edge afthe Part I sub-area. <br /> <br />The elementary school (located at the westerly edge of the Part 4 sub-area on Lot 19) is a <br />key element of the Specific Plan whose early development is encouraged. Should the <br />school seek to develop prior to Parts 1-4 private development. it will require some, but <br />not all, of the infrastructure required of other Part 4 projects. <br /> <br />Financing Program #3. Development of the elementary school may proceed <br />independently of any other development in the Plan Area with a minimum level of shared <br />infrastructure improvements. The City may coordinate with the School District by using <br />its utility enterprise capital improvement funds to assist in installing the minimum level <br />of infrastructure. Both the School District and the City would be eligible for <br />reimbursement as described in Financing Program #20. Minimal improvements required <br />are: <br /> <br />(a) Construction of the 16-inch watertrunk line in the existing Vineyard <br />Avenue, and Zone 7 Turn-out #6 modifications; <br /> <br />(b) Construction of all shared sanitary sewer improvements west of the school <br />site, or, on a temporary basis. installation of an on-site sewage holding <br />tank: <br /> <br />(c) Realignment of Vineyard Avenue from Lot 15 to the eastern Plan Area <br />boundary; and <br /> <br />(d) Construction of a sidewalk along the south side of Vineyard A venue from <br />Lot I to its intersection with the abandoned old Vineyard Avenue. <br /> <br />3 <br />