Laserfiche WebLink
O <br /> <br />O <br /> <br />O <br /> <br />STREET CONSTRUCTION PLAN SCHEDULE <br /> <br />June 1992 <br /> <br />Design work would' begin. <br /> <br />February1993 <br /> <br />Construction would begin. <br /> <br />Phase 1: <br /> <br />February1993 <br /> <br />Sanitary sewer lines would be installed ia <br />Main Street from Bemal Avenue to Abbie <br />Street; water, and storm drain lines .to be <br />installed from Old Bemal to Abbie; sewer <br />and storm drain lines would be constructed <br />from Ray Street to the Arroyo del Valle. <br />Parking would be removed, allowing a <br />travel lane in each direction. <br /> <br />Phase 2: March 1993 <br /> <br />Sanitary sewer, water and storm drains <br />would be installed in the block between <br />Abbie and W. Angela Streets. 'Parking <br />would be removed, allowing for travel lanes <br />to remain Open.. <br /> <br />Phase 3: April 1993 <br /> <br />'A water line would be installed between <br />Pleasanton Hotel and Del Valle Parkway and <br />a sewer line would' be installed between St. <br />Mary's and Ray Streets'; Parking would be <br />removed and two lanes would remain open. <br /> <br />Phase 4: May 1993 <br /> <br />This phase would involve ins.t,3,Uing water <br />and sewer lines, new street paving, and new <br />sidewalks between W. Angela Street and <br />Rose Avenue. The entire street would have <br />to be closed, with traffic diverted to Peters <br />Avenue. <br /> <br />Phase 5: <br /> <br />June-mid July <br /> <br />In this phase, water and sewer lines would <br />be installed, streets would be repaved and <br />sidewalks reconstructed between . Rose <br />Avenue and St. Mary's Street. The entire <br />street would be closed and Waffle diverted to <br />Peters and Railroad Avenues. <br /> <br /> <br />