Laserfiche WebLink
<br />6. The proposed outdoor lighting for the subject property shall be of low intensity and <br />shielded in order to minimize its visibility from off-site. Outdoor lighting shall also not <br />glare onto adjacent properties or streets. Exterior lighting shall use the lowest wattage <br />and shall limit the number of fixtures to attain the lowest luminosity. Fixtures shall be no <br />greater than 14 feet in height, including any pedestal assembly, and shall be "shoebox" <br />shielded standards or equal. The design of all lighting shall be reviewed and approved by <br />the Planning Director. The lighting shall utilize photocells and timers to shut off lighting <br />when the facility is not in use. The parking, building, and general site security lighting <br />shall be the minimum allowed by the Police Department. The applicant shall submit a <br />photometric plan which shall include the following: <br /> <br />. Photometric calculations detailing all exterior security lighting, <br />. Foot-candle calculations, <br />. Fixture schedule, and <br />. Cut sheets for light fixtures identifying the specific luminary and lamp <br />manufacturer. <br /> <br />7. The PUD development plan modification and conditional use permit approvals will lapse <br />and shall be void within two years following the effective date of the City Council ap- <br />proval, unless a building permit is issued and construction has commenced and is dili- <br />gently pursued toward completion or an extension has been approved by the City. <br /> <br />8. Prior to issuance of a building permit, the project developer shall pay the required com- <br />mercial development school impact fee as prescribed by state law and as adopted by the <br />Pleasanton Unified School District. <br /> <br />9. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. Notwith- <br />standing the project developer's participation in such a program, the City may withhold <br />building permits if the City determines that sufficient water is not available at the time of <br />application of building permits. <br /> <br />10. Prior to issuance of a building permit, the project developer shall pay the applicable <br />Zone 7 and City connection fees and water meter cost for any water meters, including ir- <br />rigation meters. Additionally, the project developer shall pay any applicable Dublin San <br />Ramon Services District (DSRSD) sewer permit fee. <br /> <br />II. The building permit plan check materials will be accepted for submittal only after com- <br />pletion of the IS-day appeal period, measured from the date ofthe approval letter, unless <br /> <br />SR:06: 287 <br />Page 14 <br />