My WebLink
|
Help
|
About
|
Sign Out
SR 06:271
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2006 12:32:18 PM
Creation date
11/29/2006 12:14:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/5/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:271
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />glare onto adjacent properties or streets. Exterior lighting shall use the lowest wattage <br />and shall limit the number of fixtures to attain the lowest luminosity. <br /> <br />13. The applicant shall submit a waste management plan to the Building Department prior to <br />issuance of building or demolition permits, The plan shall include the estimated compo- <br />sition and quantities of waste to be generated and how the project developer intends to <br />recycle at least 50-percent of the total job site construction and demolition waste meas- <br />ured by weight or volume, Proof of compliance shall be provided to the Chief Building <br />Official prior to the issuance of a final building permit. During demolition and construc- <br />tion, the project developer shall mark all trash disposal bins "trash materials only" and all <br />recycling bins "recycling materials only". The project developer shall contact Pleasanton <br />Garbage Service for the disposal of all waste from the site. <br /> <br />14. Only natural gas burning fireplaces or USEPA-approved wood/pellet burning stoves shall <br />be installed in the house covered by this approval. <br /> <br />15, The main structure shall be constructed to allow for future installation of a photo voltaic <br />(PV) system. The project! building developer shall comply with the following require- <br />ments for making all houses on the lot photo voltaic ready. Making the home <br />photovoltaic ready shall require the following measures to be implemented with the con- <br />struction of the structures covered: <br /> <br />a. Electrical conduit and pull strings shall be installed from the roof/attic area to the <br />buildings' main electrical panels. <br /> <br />b. Roof trusses shall be engineered to handle an addition load of five (5) pounds per <br />square foot beyond that of the anticipated load for the roofing material. <br /> <br />c, An area shall be provided near the electrical panel for the "inverter" required to <br />convert the direct current output from the photovoltaic panels to alternating current. <br /> <br />16. The electrical plan for this home shall provide telecommunications infrastructure consis- <br />tent with state-of-the-art methods, e.g" cabling for DSL, Broadband or wireless, services, <br />wiring for total room access, etc., in effect at the time that building permit(s) aired issued. <br />The plan shall be part of the building permits issued for plumbing and electrical. <br /> <br />17. Safety nets to protect the house from the proximity of the golf course are not allowed, <br /> <br />18. The sides of the structure facing the golf course fairways shall address safety issues that <br />might arise from the proximity of the golf course, e.g., using tempered glass in the win- <br />dows that may be hit by golf balls. This detail shall be shown on the building permit plan <br /> <br />SR:06:271 <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.