Laserfiche WebLink
<br />and provided to the Planning Department before the first framing or structural inspection <br />of each building on each lot by the Building Department. <br /> <br />31. The homes covered by this approval shall be constructed to encourage telecommuting by <br />providing as an option telecommunications infrastructure consistent with state-of-the-art <br />methods at the time that the homes are submitted for site-specific design review approval. <br /> <br />32. The project developer shall submit a waste management plan to the Building Department <br />prior to issuance of building or demolition permits. The plan shall include the estimated <br />composition and quantities of waste to be generated and how the project developer in- <br />tends to recycle at least 50-percent of the total job site construction and demolition waste <br />measured by weight or volume. Proof of compliance shall be provided to the Chief <br />Building Official prior to the issuance of a final building permit. During demolition and <br />construction, the project developer shall mark all trash disposal bins "trash materials <br />only" and all recycling bins "recycling materials only". The project developer shall con- <br />tact Pleasanton Garbage Service for the disposal of all waste from the site. <br /> <br />33. Trellis-covered arbors and/or porches up to a height of 15-feet supporting photovoltaic <br />panels shall be exempt from the City's Administrative Design Review procedures. De- <br />sign review at the Planning staff level and building/electrical permits will still be re- <br />quired. <br /> <br />34. The project developer shall provide to the buyers of the houses covered by this approval, <br />photovoltaic systems as an option. With the building permit plan set, the project devel- <br />oper shall show the installations for each of the buildings covered by this approval to the <br />satisfaction of the Planning Director before issuance of a building permit. <br /> <br />35. The project developer shall implement the following measures with the construction of <br />the structures covered by this approval so that the owners can install roof-mounted photo- <br />voltaic systems in the future: <br /> <br />a. Electrical conduit and pull strings shall be installed from the roof/attic areas to the <br />buildings' main electrical panels. <br />b. Roof trusses shall be "engineered" to handle an additional load of five-pounds per <br />square foot beyond that of the anticipated for roofing. <br />c. An area shall be provided near the electrical panel for the "inverter" required to <br />convert the direct current output from the photovoltaic panels to alternating current. <br />d. A bi-directional electrical meter shall be installed. <br /> <br />These measures shall be shown on the building permit plan set submitted to the Planning <br />Director for review and approval before issuance of the first building permit. The project <br />developer shall provide to the future homebuyers the necessary information delineating <br />the means by which photovoltaic panels can be applied to the roofs of the structures cov- <br /> <br />SR 06:182 <br />Page 9 of 20 <br />