Laserfiche WebLink
certificate of occupan cy_ The Green Building Compliance 01=fi cial or the Brxild ixzg and Safety <br />Division staff xrxay also conduct other inspections as needed to ensure con-xpliancc with this <br />Chapter. If as a result of axzy such iuspcction> the Green Building Conzpliaucc Official or <br />Building and Safety Division stall determines that the Covered Project does not comply with the <br />Yre-Pernii tong Documentation, a stop-work order n~xay be issued. At the discretion oI-the ~ircen <br />Building Compliance Olfici al, such a stop-work order may apply to the portion of the project <br />impacted by noncompliance or to the entire prof ect 'Che stop-work order shall remain in effect <br />until the Green Building Compliance Official determines that the Covered Yroj act will be <br />bx-ought into compliance with the Prc-Pcrnzitting, Documentation and this Chapter. <br />c_ Substitution of Credits: During compliance review for Covered Projects, <br />tlexibi.lity niay be exercised by the Green Building Compliance Official to substitute the <br />approved credits with other credits in the approved, applicable Green Building Rating, Systcn~_ <br />Substitution shall occur only at the request oS'the Applicant and when it is deterx-nined that the <br />originally approved credits arc no longer feasible- <br />d. Coninliance Uocumentation_ [7ocumentation shall occur in up to three stages: (1~P rior to issx <br />Coxrxxr~ercial, City-Sponsored, Mu1Li-N anzily or Multi-Use Project, if deemed necessary by the <br />Green Building Compliance Oft-fetal. <br />(1) Prior to issuance o}-an occunanev ce rti l3cate: Prior to final building approval <br />and/or issuance of a final carol-icate of occupancy. the Applicant shall submit the following to <br />the Green Building Gonipliance Ulf3cial_ (a) documentation that verifies incorporation to the <br />design and construction-related credits li-on~x the Pre-P ern~xitting Docurrxentation for the Covered <br />Pro.jeet~ and (b~ a letter front the project architect or project contractor that certifies that the <br />G overed Project has been constructed in accordance with the approved Green Building Proj act <br />Checklist The Applicant niay also provide: (a) any additional docunicntation that would be <br />required by the LEF:D' `"' Reference Guide for LEED~M certification, and, ~b~ any additional <br />information the applicant believes is relevant to determining its good faith efforts to comply with <br />this Chapter. <br />(2) After one veer of occupancv of env Commercial City-Sr~onsored Multi-Family <br />Residential or Mixed-Use Protect= After one year or occupancy of any C7omrrxercial., <br />City-Sponsored, Multi.-Family Residential or Mixed-Use Project if rcq uired by the ~ireea <br />Buiiding Compliance Officer, the Applicant, property owner, or building tenant shall submit to <br />10 <br />