My WebLink
|
Help
|
About
|
Sign Out
PC 2006-10
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 4:50:04 PM
Creation date
8/28/2006 9:06:33 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/8/2006
DOCUMENT NO
PC-2006-10
DOCUMENT NAME
PRZ-13
NOTES
CITY OF PLEASANTON
NOTES 3
AMMEND CHAPTER 17.50
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d_ Compliance as a Condition of Annrov~ 1. Compliance with the provisions of this <br />Chapter shall be listed as a. c.c>ndition of approval on any Design Kcview or Planned. Unit <br />Development Design Kcview approval issued fora Covered Project. Failure to coxrxply with any <br />of ttic tcn~ns of this Chapter shall subject the Covered Prgject to the full range of enfo rcaxn ent <br />n~echa.x~isnis set forth in Section 17.50.1 00, below- <br />77_50_050 Submission of Pre-Permitting Documentation- <br />a. Yre-Permiuin~ Docun~cntation: In cox junction with the application for Design <br />Review or Planned Unit Development Design Review, whichever is applicable, the Applicant <br />shall submit documentation indicating the measures to be used to achieve the applicable Green <br />Building rating ("Pre-Permitting Docun~xentation"~. The City cnco urages the Applicant to use; a <br />LEED-~~'~'~ -accredited professional or similarly experienced parson to prepare the Pre-Permitting <br />Docun-xcntation. This documentation shall include- <br />(1) the applicable Green Building Project Checlclisi, <br />(2) the applicable Green Building Worksheet with an analysis of each credit <br />clainieci, zuid, <br />(3J any other documentation that niay be necessary to show con~plianee with <br />this Chapicr. <br />~m~>vc~d lu .Sc:cliun 17.~0.070J <br />b. Review and Pre-Hearing MeetinK._ ARer submission of the Prc-PenTxitting <br />Documentation required by Section 1 7.50.050(x), but prior to the hearing on the Lllesign Review <br />or Planned Unit Dcvclopn-xcnt Design Review, the Green Building Compliance Official shall <br />review the Yre-Permitting Documentation and arrange a meeting with the Applicant to discuss <br />the proposed Grccn Building, picas urc s, as needed- <br />17_50_060 Kcview of Prc-Permitting Documentation_ <br />a. Approval ~nxo vcd lu .Sege/ion 17.50.070) "I'he Green Building Coniplisniec <br />Official shall only approve the. Prc-Permitting Documentation if it is determined that the <br />Pre-Permitting Documentation indicates that the Covered Project can achieve the applicable <br />Green Building rating, as set forth in Section 17.50.040. if the Green Building Cotripliatice <br />Of£cial deten-i~incs that these conditions have been xnet, the Prc-Pcrxritting Doc un-xentation shall <br />be xnarh-cd "Approved." and returned to the Applicant- The ~ireen Building Compliance Otti ci al <br />x <br />
The URL can be used to link to this page
Your browser does not support the video tag.