Laserfiche WebLink
So. "The soils engineer shall certify the pad compactions of call lcxis containing till to the <br />satisfaction of the Chief Building <~Ificial prior to the issuance oi- building perliiits. <br />57. Building acrd site plans arc to be suhr~-ritted tc> the Building and Sal cty Division on <br />computer disk in a format approved by the Chief Building C~fiticiaL Digitized <br />in Fo rn~ration shall be subn-ritted before ceq nesting a final inspection and should reflect as- <br />built situs and architectural information as approved by the Chief Building Official. <br />52. All construction activities shall be limited to the hours of 8:00 a.m. to 5:00 p.m., Monday <br />through Sataard ay- In addition, no construction shall be allowed on F~-deral holidays. if <br />Future complaints are received regarding the Saturday consu-uction hours, the Ylanning <br />Director may modify or revoke the Saturday construction hours. The Ylanning Dire c:tor <br />may allow earlier "start-times" for specific construction activities ~c. g., conerete- <br />foundation/floor pouring, if it can be dernonsirated to the satisfaction of the Planning <br />Director that the construction and construction traffiic noise will not affect nearby <br />residents. All construction eq uipnienL must meet Departir~ent of Motor Vehicles (DMV~ <br />Hoist standards grid shall be equipped with muffling devices. <br />53_ A temporary construction trailer shall be allowed on site during construction for use <br />during, the allowed hours of operation. At no time shall can~rpcrs, trailers, n~rotor horncs., <br />or any other vehicle be used as living or sleeping quarters on the construction site. All <br />such vehicles shall be removed fii-om the site at the and of each workday. <br />54. There shall be no truck deliveries, parking lot sweeping, outside ni aintcnance, or garbage <br />pick-up between the hours of 10.00 p. n~r. and 6:00 a.m. during project construction. 'Flris <br />condition does not amend the waste pickup schedule of Pleasanton C3arbage Service. <br />55. 7i-any prehistoric or historic z3r-tifacts, or other indications of cultural resources arc found <br />once the project construction is underway, a77 work xn ust stop within 20 xizetars <66 fact) <br />of the find. A qualified archaeologist shall be consulted for an irnr-rrcdiate evaluation oi- <br />the find prior to res urning ground-breaking construction activities within 20 n~etcrs of-the <br />find. IPthe find is determined to be an importai~t archaeological reso urcoy the reso ~ar-ce <br />shall be either avoided, if feasible, or recovered consistent with the req uirerrtents of <br />Appendix K of the State CEQA Guidelines. In the event of discovery or recognition of <br />arry human rem gins in any on-sire location, there shall be no further excav ation or <br />disturbance of-ttic site or any nearby area reasonably suspected to overlie adjacent <br />remains until the County coroner has determined, in accordance with any law concerning <br />investigation of the circumsta»ces, the manner and cause of death and has made <br />recommendations concerning trcatrrrent and dispositions of the huxrran rcxz~ai ns to the <br />parson responsible for the excavation, or to his/her authorized rap rc sentative. A similar <br />note shall appear on the improvement plans. <br />56. Portable toilets used during construction shall be kept as fir as possible front existing, <br />residences and shall be ex~~pticd on a regular basis as necessary to prevent odor. <br />8 <br />