Laserfiche WebLink
41- A lot lot shall be placed within the landscaped area next to the parking stalls adjacent to <br />the developnicnt exit driveway. 1'he parking stalls in the area shall be adj usted <br />accordingly. "fhe revised site plan showing this modification shall be reviewed and <br />approved by the Planning Director prior to the issuance of a grading/building pern~ii. <br />42. "t'hc applicant shall install whole 1-souse inns in each uliit- "I ~Llis change shall be shown c>n <br />the construction drawing submitted for plan cheek prior to the issuance of a <br />grading/building pcrlnit- <br />BUILDING AND SAFETY UI VISION <br />43. Prior tcl the issuance of building permits, the applicant shall subanit a waste n~aanagen~acnt <br />plan to the Building and Saiaty Division. The plan shall include the estimated <br />composition and quantities of waste to be generated and how the applicant intends to <br />recycle at least 50 percent of the total job site construction and demolition waste <br />measured by weight or volume. Proof of co mplia.aice shall ba provided to the Chief <br />Building Official prier to the issuance of a Fnal. building permit- During den~aolition and <br />construction, the applicant shall mark all trash disposal bins "trash materials only" and -all <br />recycling bins "recycling materials only". The applicant shall contact Pleasanton <br />Garbage Service for the disposal of all waste f'ron~ the site. <br />44- "fhe homes covered by this approval shall be consn'ucled to encourage tclecon~an-auting by <br />providing, as an option, telecommunications infrastructure consistent with slate-of=the-art <br />methods, e-g., cabling for DSL service. wiring for total room access, etc. The applicant <br />shall submit those measures included in the home construction for review and approval <br />by the Building grad Salcty Division before issuance of the first building permit. <br />45- All dwelling units in the development shall be constructed to meet Title 24 state energy <br />eORSCYV allOn YCq nlrenleniS. <br />4~. All building and/or structural plans must comply with all codes and ordinances in e1-Feet <br />before the Building and Safety Division will issue permits- <br />47- "fhe applicant shall sublrait plot plan showing building sctbac:ks and a topographic plan <br />showing grading and drainage- Pad elevations, finish floor elevations. retaining walls, <br />easen~acnts, anaxilriuln height ol~ the highest structure., and the front, rear, and side yards <br />aa-e to be indicated on the plan- Plan is to be signed by a regisLCred civil engineer- "l~he <br />plot plan shall show compliance wish Sections 2907(4) and 70072(4) of the Unifbrnz <br />Building Coda. <br />4x. "1'he applicant shall su bnzit a site soils report to the Chief Building Olrcial, wish as many <br />copies as required by the Chief Building Official prior to issuance of a gradil~g permit, for <br />third party peer review grad shall pay for such review at the bane specified. <br />49- The record grading plan is to be su blr~itted to the Chief L3uild ing Official before issuance <br />of a t-luilding perrrait. <br />7 <br />