My WebLink
|
Help
|
About
|
Sign Out
PC 2006-02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 4:47:26 PM
Creation date
8/28/2006 8:39:07 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/25/2006
DOCUMENT NO
PC-2006-02
DOCUMENT NAME
PDR-493
NOTES
RHL DESIGN GROUP INC
NOTES 3
MCDONALDS FACADE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. The approved building materials acid colors shall be stated on the building permit plarxs <br />to the satisfaction of the Planning Director. Substitutions shall not be allowed unless <br />otherwise approved by the Plaxiraing Director- <br />9- Construction activities shall be limited to the hours of 8:00 a_nz- to 5:00 p-m-, Monday <br />ilzro ugh Saturday_ All construction equipment must Lrieat Department of Motor <br />Vehicles ~UMV~ noise standards aad shall be equipped with muffling devices- <br />13uildiug <br />9- Ubtain a building permit from the Building Department and any other applicable City <br />pern-iits for the project prior to the corr~rraence;rraent of any construction- <br />1 O. All. structures covered by this approval shall be constructed to= <br />a. Meat Title 24 state energy requirements, axzd <br />b. Comply with all codes and ordinances in el'iact before the Building <br />Department will issue permits. <br />1 ] - Prior to final building permit inspection, the Planning Department shall conduct a <br />[final inspection ofi the structure to ensure compliance with the platzs- <br />12. During G'o nstruction~ the project developer is responsible for irra plen~aenting the <br />following measures: <br />a- Portable toilets shall be kept as far as possible front existing residences and <br />shall be emptied on a regular basis as necessary to prevent odor- <br />b. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is enipticd or removed on a. weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that <br />could contribute to storm water runoff pollution- <br />c_ Remove all dirt, gravel, rubbish, refuse, and green waste front the street <br />pavcrrxent and storm drains adjoining the site- Li nzit construction access <br />routes onto the site and place gravel on them- Do not drive vehicles and <br />equipxiaent off paved or graveled -areas during, wet weather- 13ro oxra-sweep the <br />street pavement adjoining the project site on a. daily basis. Scrape caked-on <br />an ud and dirt from these areas before sweeping- <br />d. histall -Filter xriatc.rials (such as sandbags, lilic.r t~ak~ri c, etc.) at the stc~rn~ drain <br />inlet nearest the downstraarn side of the project site in order to retain any <br />debris or dirt Flowing in the storam drain sy sicnz. Maintain and/or replace ti lter <br />materials to ensure effectiveness and to prevent street flooding. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.