Laserfiche WebLink
c. No oil, gasoline, chemicals, or other harmfiul materials shall be deposited or disposed <br />within the dripline of the trees or in drainage cl-rannels, swalas, or areas ih at nay lead <br />to the dripline. <br />d. No stockpiling/storage of fill, ate., shall take place underneath or within live feet of <br />the dripline of Lhe existing treas. <br />22_ The applicant shall work with staff to provide adequate native materials to screen both sides <br />of the house from 7-580. 'fhe plarxt species, size and location are sut~ject to the review and <br />approval of the Planning Director. <br />23. Within 90 days of occupancy of the dome, a Final landscape inspection shall be conducted <br />by the Planning Departxaent. <br />Buiildiug <br />24. All conditions of approval for this case shall be reprinted and included as a plan sheet(s) <br />with the building permit plan check sets submitted for review and approval. These <br />conditions of approval shall be on, at all times, all grading and construction plarxs kept on <br />the proj cct site. <br />25_ The approved building materials and. colors shall he stated on the building permit plans to <br />the satisfaction of the Planning Director. Substitutions shall not be allowed unless <br />otherwise approved by the Planning Director. <br />26_ "I'hc home shall submit for a building permit, the plan set shall contain: <br />a_ A site plan, <br />h_ A full landscape and irrigation plan for the ii-ont and rear yards, <br />c. A detailed fencing plan, and <br />d_ A grading plan <br />27. The building shall meet the applicable 'Title 24 state energy requirenients_ <br />28_ All building and/or structural plans must comply with all codes and ordinanecs in effect <br />beF~~re the Building and Safety Division will issue permits. <br />29_ The applicant shall subrTx it three full-size seas o£ construction plans (wet-starrxped and <br />signed), two sets of the necessary structural acid Title 24 calculations, two copies of a site <br />specific soils report, and the completed Building Pcrxnit Questionnaire to the Building and <br />Safety Division, along with the necessary fees, to initiate the City's plan chat] process. The <br />plan check will be accepted only after the completion of the Design Review procedure's <br />7.5-day appeal period, unless the applicant submits a signed statement acknowledging that <br />the plan check tees rrxay be forfeited in the event that the approval is overturned or the <br />design. is signi[icantly changed as the result of an appeal. In no case will a building pcrrnit <br />be issued prior to the expiration of the 15-day appeal period. <br />4 <br />