Laserfiche WebLink
30. Prior to issuance of a building permit, the applicant shall pay the applicable Zone 7 axed <br />Gity connection fees and water meter cost For any water xr~eters. including irrigation nieters_ <br />Additionally, the developer shall pay aizy applicable DSRSD sewer perrnit fee- <br />31. Yrior to first framing iuspectiou~ the height of the primary structure shall be surveyed and <br />verified as being in conformance to the approved building height of 24 feet from the lowest <br />grade- Said verification is the project developer's responsibility and shall- <br />sx_ Yrior to receiving a foundation inspection for the structure, the. applicant shall <br />submit a pad elevation certification prepared by a licensed land surveyor or registered <br />civil engineer to the Ghief Building O[-ficial and Planning Director, certifying that the <br />pad elevation and building location <setbacks) are pursuant to the approved plans- <br />32- The main structure shall be constructed to allow for future installati otz of a Photo Voltaic <br />(PVC system. The. applicant shall comply with the t~~llowing requiren-xents (or nizxkirxg house <br />photovoltaic ready- Making the home photovoltaic ready shall require the following <br />xncasures to be ixnpletr~ented with the construction of the structures covered: <br />1 J 1/lcetrical conduit and cable shall be installed tronz the roof/attic area to the building's <br />trxain electrical panel- <br />2J Roof trusses shall be engineered to handle an addition load of five (SJ pounds par <br />square foot beyond that of the anticipated load for the rooting n-xatcrial_ <br />3J An area shall be provided near the electrical panel for the "inve rtcr" required to <br />convert the direct current output front the photovoltaic panels to alternating current- <br />4J A bi-directional electrical meter shall be installcd- <br />These measures shall be shown on the building permit plan set submitted to the Planning <br />Director for review acid approval before issuance of the first building permit. "17ie project <br />developer shall provide the future homeowners the necessary information delineating the <br />nzcaiis by which photovoltaic panels can be applied to the roofs of the structures covered by <br />this approval- 'Phis information shall be submitted to the Planning Director for review and <br />approval prior to occupancy- <br />Fire <br />33. ~I'lze project developer shall meet all applicable fire and security requirements in <br />Chapters 2024 and 20.3E of the Pleasanton Municipal Code- <br />34. The site shall be kept tree of fire hazards from the start of construction to final inspe-ction_ <br />5 <br />