Laserfiche WebLink
<br />5. No fences are allowed in the front yard area except for low, decorative open fences not <br />exceeding 30 inches in height. <br />6. FAR calculation does not include 600 sq. ft. of garage area. Any squarc footage within the <br />garage greater than 600 sq .ft. would be included in the FAR calculation. <br /> <br />The proposal does not include development standards for Class I and/or Class II accessory <br />structures. Staff recommends that the development standards for accessory structures follow <br />those that are requircd for R-I-20,000 zoning district. Staff believes that the proposed <br />devclopment standards are appropriate and will enablc the project to be compatible with the <br />surrounding neighborhood. <br /> <br />The subject site is within the West Foothill Road Corridor Overlay District (WFRCOD). <br />However, the site does not adjoin Foothill Road and, therefore, it is not subject to these <br />development standards as to lot size, building setback, and building height. The proposed <br />development, however, is subject the dcsign criteria specified in WFRCOD in terms of foreridge <br />development, access/frontage improvements, landscaping, retaining walls, and fencing. The <br />project is designcd to meet these criteria. <br /> <br />DISCUSSION <br /> <br />The proposed homes on Lot I and Lot 3 are designed and would be constructed to meet the <br />Green Building Ordinance. In fact, the submitted green building checklist shows that the <br />proposed homes would achieve 91 green points which has exceeded the required 50 green points. <br /> <br />Minor grading would be performed on Lot I to separate it from Lot 2. Retaining walls not to <br />exceed three-feet in height would be constructed on Lot 3 to the south of the proposed house. <br />The grading plan shows a seven-foot elevation difference on Lot 3 between the driveway and the <br />house entrance. To overcome this grade difference and to provide practical access to the house <br />both internally (from the garage) and externally (from thc front yard), a rctaining wall between <br />Lot 2 and Lot 3 and/or steps may be utilized. It is conditioned that the final grading plan for Lot <br />3 include this retaining wall and/or steps. <br /> <br />City utilities are available on Dublin Canyon Road. Utilities serving the proposed development <br />would be located beneath the private street (Young Court). <br /> <br />Please refer to the Planning Commission staff report (Attachment 5) for additional information <br />and details ofthe project such as the site plan, landscaping, geotechnical investigation, noise <br />study, tree assessment, and protection of wildlife. <br /> <br />As part of the proposal, the applicant has submitted an arborist report prepared by HortScience, <br />a Biological Assessmcnt Study prepared by WRA, and a Noise study by Thorburn Associates. <br />In addition, the Geotechnical Review, prepared by Nicholas Engineering Corporation, was <br /> <br />SR:06:202 <br />Page 4 <br />