Laserfiche WebLink
<br />ATTACHMENT 1 <br /> <br />EXHIBIT A <br />Preferred Circulation Network Refinements <br />(Street Widenings and Extensions) <br /> <br />1. An HOV lane on eastbound 1-580 from Hacienda to Greenville Road. - revised as <br />a result of Triangle Study <br />2. Add an HOV lane on north 680 from Milpitas to SR 84 - CalTrans planned <br />improvement <br />3. Eliminate Rose Avenue extension to Valley Avenue - County right of way <br />required which is not available <br />4. Eliminate widening of Bernal Avenue between SunollFirst Street and <br />Independence Drive and between Angela Street and Nevada Street - incompatible <br />with neighborhood character <br />5. Eliminate widening of Foothill Road between Stoneridge Drive and Muirwood <br />Drive South - currently 2 lanes with left turn pockets; no further widening <br />planned. <br />6. Eliminate widening of Hopyard Road between Valley Avenue and Division Street <br />- incompatible with neighborhood character. <br />7. Eliminate widening of Old Santa Rita Road south of Rosewood Drive - widening <br />not needed. <br />8. Eliminate widening of Rosewood Drive west of Santa Rita Road - widening not <br />needed. <br />9. Eliminate widening of Vineyard Avenue from Bernal Avenue to 4,000 feet east of <br />Bemal Avenue - 2 lane design has been approved by the City Council <br />10. Eliminate widening of West Las Positas Boulevard between Foothill Road and <br />Payne Road - not needed without the interchange <br />11. Eliminate the widening of West Las Positas Boulevard east of Fairlands Drive- <br />not needed <br />