My WebLink
|
Help
|
About
|
Sign Out
SR 06:204
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2006 2:45:43 PM
Creation date
8/10/2006 11:36:38 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/29/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:204
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT 2 <br /> <br />STREET NETWORK ELEMENTS FOR ALTERNATIVES A, BAND C <br /> <br />Existing Conditions - existing land use, traffic volumes, roadways, intersection lane and traffic <br />control configurations. <br /> <br />Year 2025 - Alternative A) l'leas.mton intersection eapacitv enhancements - Exist;n!?: + Approved <br />Pleasanton Land Develollment. Illus re!?:ional 2025 develollment with buildout of the Livermore <br />and Dublin Generall'!:ms. <br />Over the next 20 years, this alternative assumes that the following regional network clement will be <br />constructed: <br />. An HOV lane on eastbound 1-580 from Santa Rita RoadHacienda to Greenville Road. - revised <br />as a reslllt ofTrianf!le SllIdy <br />. Isabel at 1-580 Interchange <br />. Isabel/Route 84 widening to 4 lanes from Pigeon Pass to Stanley, and 6 lanes from Stanley to 1- <br />580 <br />· Dublin Boulevard extension to Livermore as 6-lane divided roadway with a 4-lane section <br />through the unincorporated area. <br />. Jack London extension to El Charro Road as a 4-lane roadway. <br />. El Charro Road widening to 6 lanes from 1-580 to Jack London <br />. East Dublin Properties roadway network <br />· New Livennorc General Plan roadway network including only 2 lanes on First Street through <br />downtown. <br />. An HOV lane on north 680 from Milllitas to SR 84 - CalTrans vlanned imorovement <br /> <br />Pleasanton Roadway network changes assumed over the next 20 years: <br />. ;&.lLNew Traffic Signals at the following intersections: <br />o Bernal Avenue at 1-680 southbound ramps <br />o Bernal Avenue at Kottinger Drive <br />o Bernal Avenue at Main Street <br />o Bernal Avenue at Nevada Street <br />o BIlSCR Read at lron.....ood Park..."a)' alremly constrllcted <br />o fflethill Read at Castlewood Drive in COllntv illrisdiction <br />o Hopyard Road at Del Valle Parkway <br />o Santa Rita Road at Francisco Street <br />o Stoneridge Mall Road at Deodar Way <br />o Stoneridge Mall Road at Embarcadero Court <br />o Sunol Boulevard at Castlewood Drive <br />o Sunol Boulevard at 1-680 northbound <br />o Sunol Boulevard at 1-680 southbound <br />o Valley :""eHlle at Blackbird Drive not compatible with commllnity character(PC voted <br />3-2 not /0 installtrafflc Iif!ht and retain stov sif!nJ <br />o Valley :"veHlle at Belllder Street -already constrllcted <br />o Valley Avenue at Case/Junipero <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.