My WebLink
|
Help
|
About
|
Sign Out
SR 06:157
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2006 11:35:14 AM
Creation date
6/16/2006 11:20:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/20/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The roadway width and transition tapers are to accommodate vehicles merging for ingress and <br />egress from Vineyard Avenue to the side streets. Conventional tee intersections will be <br />constructed at Thiessen Street (East and West). Stop signs and legends will also be installed on <br />the side streets. <br /> <br />The plans will maintain the southerly edge of roadway pavement and increase the roadway <br />width to the north, retaining a 16-foot buffer between the north edge of pavement and the <br />Lonestar property fence line to accommodate a pedestrian trail and landscaping along the <br />fence line. Underground conduits will be installed at the intersection of Vineyard Avenue and <br />Thiessen Street (West and East) to accommodate a future traffic signal(s) if necessary, to <br />accommodate future development in the area. <br /> <br />BIDS <br />Sealed bids for this project were opened on June 8, 2006. A total of two (2) bids were <br />received, which ranged from $544,660 to $665,678.75. The engineer's estimate for the <br />project was $595,000 (see attached Bid Summary). <br /> <br />The low bid of $544,660 was received from Granite Construction Company of Santa Clara, <br />California. Past work performed by Granite Construction Company was verified to be <br />satisfactory . <br /> <br />BUDGET <br /> <br />Estimated Expenditures <br />Construction Bid <br />Construction Contingency (10 %) <br />Total: <br /> <br />$ 544,660.00 <br />$ 54,466.00 <br />$ 599,126.00 <br /> <br />SCHEDULE <br /> <br />The proposed schedule for the subject project is as follows: <br /> <br />Council A ward of Contract <br />Start of Construction <br />End of Construction <br /> <br />June 20,2006 <br />July 10, 2006 <br />August 28,2006 <br /> <br />As requested by Council Member Thorne at the previous meeting in which this matter was <br />heard, please find attached an accident report summary related to the existing roundabouts. <br />Also included is a bid summary with the apparent low bidder's itemized line items. <br /> <br />SR 06:157 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.