<br />Honorable Mayor and Members of the City Council: <br /> <br />BACKGROUND <br /> <br />The subject project consists of installing new 8", 10" and 15" sewer mains and service laterals <br />along various City streets. The project also includes installing "cured-in-place" pipe (CIPP) along <br />City easements located in residential backyards on Gale, Third and Whiting Streets. In <br />preparation for the project, the City has obtained construction access agreements from the <br />affected residents. <br /> <br />The project plans were prepared by Pakpour Consulting Group, Inc. A public meeting was held <br />on January 23, 2006, to inform residents of the project and to address their concerns. The <br />residents will be informed of the construction details and scheduling once the contract is awarded. <br /> <br />Sealed bids for this project were opened on April 27, 2006. The City had requested base bid <br />items for sewer replacements along Adams Way, Bonita Avenue, Nevis Street, Gale Avenue and <br />Whiting Street, and an add/deduct item for work on Mirador A venue. One bid was received from <br />McNamara & Smallman Construction Inc. for the base bid amount of $940,270 and an add bid <br />amount of $94,720, as compared to the Engineer's Estimate for the base bid of $876,869 and an <br />add amount of $99,100. All bid documents were found to be in order. The contractor has <br />performed similar work for the City of Pleasanton and the work was verified to be satisfactory. <br /> <br />Since there is not enough funding available at this time, staff recommends not including the add <br />item for Mirador A venue to the project. This portion of the project will be constructed in the <br />summer of 2007 when additional funding becomes available in the Fiscal Year 2007-08 budget. <br /> <br />Project funding will be provided from the Annual Sewer Replacement fund, along with the <br />additional funds that will become available as of July I, 2006. A 15% contingency amount is <br />recommended for the project due to the nature of the work, which consists of underground work <br />and work on private property where existing utility locations will have to be field-verified with <br />hand digging. <br /> <br />BUDGET <br /> <br />Funding Sources <br />Annual sewer replacement-CIP 052002 (current funding) <br />Annual sewer replacement-CIP 052002 (part of FY 06-07 recommended funding) <br />TOTAL <br /> <br />$ 886,916 <br />$ 300,000 <br />$1,186,916 <br /> <br />SR06:138 <br />Page 2 of3 <br />