My WebLink
|
Help
|
About
|
Sign Out
SR 06:138
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2006 11:34:20 AM
Creation date
6/16/2006 11:12:55 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/20/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:138
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Expenditures <br />Design (Pakpour Engineers) <br />Construction contract <br />Contingency (approximately 15%) <br />Construction Services (survey, material testing, soil samples) <br />TOTAL <br /> <br />$ <br />$ <br />$ <br />$ 30,000 <br />$1,186,270 <br /> <br />79,000 <br />940,270 <br />137,000 <br /> <br />SCHEDULE <br /> <br />The proposed schedule for the subject project is as follows: <br /> <br />Council A ward of Construction Contract <br />Start of Construction <br />End of Construction <br /> <br />June 20,2006 <br />July 19, 2006 <br />September 13, 2006 <br /> <br />FISCAL IMPACT <br /> <br />This project will improve the performance of the sewer mains and reduce on-going maintenance <br />costs. <br /> <br />Respectfully submitted, <br /> <br />~~~ <br /> <br />David P. Culver <br />Director of Finance <br /> <br />AJv <br /> <br />.. 7a 0L <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />Nelson Fialho <br />City Manager <br /> <br />Attachment: Bid Summary <br /> <br />SR 06:138 <br />Page 3 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.