My WebLink
|
Help
|
About
|
Sign Out
RES 99075
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1999
>
RES 99075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:44:18 PM
Creation date
6/15/1999 4:57:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MONITORING PLAN <br /> <br /> Impact / Specific Plan Measure Timing <br /> <br />4.9-8: Worker Exposure to Hazardous Demolition Waste <br /> <br />Demolition of all structures shall be conducted in accordance with applicable Prior to demolition of any <br />requirements of the Califomia Department of Industrial Relations (Cal OSHA) structure. <br />for lead, with appropriate follow-up measures taken if lead-based paint is found. <br /> <br />Demolition of all structures shall be conducted in accordance with <br />requirements of Cal OSHA and the Bay Area Air Quality Management <br />District (BAAQMD) for asbestos, with appropriate follow-up measures if <br />asbestos is found. <br /> <br />4.9-9: Releases of Hazardous Matetiffs During Construction <br /> <br />A Spill and Pollution Prevention Plan shall be prepared by the developer of Plan preparation prior to <br />each project with soil disturbance (e.g., grading) of at least 5 acres. The Plan issuance of grading permit. <br />must (1) be prepared prior to the start ofearthwork activities; (2) designate an Implementation during <br />on-site employee responsible for Plan implementation; and (3) include grading and construction. <br />anticipated equipment needs and maintenance, emergency response <br />procedures for hazardous materials releases, and procedures for contacting <br />designated regulatory agencies in the event of a hazardous materials release. <br /> <br />Notification of the Underground Services Alert (USA). as well as site tenants Prior to commencement of <br />shall take place prior to groundbreaking to obtain information on the location grading and construction. <br />of possible underground utilities. <br /> <br />Removal of above-ground or underground fuel tanks shall take place in As needed. <br />accordance with the requirements of the Livermore-Pleasanton Fire <br />Department, if these are to be removed as part of development under the <br />Specific Plan. <br /> <br />VISUAL (Section 4.10) <br /> <br />4.10-1: Visual Changes in Subarea 1 <br /> <br />In order to minimize the potential visual impacts of development on Lot 12, <br />the following additional standards shall apply: <br /> <br />· Not more than one lot shall be permitted to occupy the rear 125 feet of Prior to PUD Development <br /> the existing Lot 12; Plan approval. <br /> <br />· Buildings on lots that are located within 300 feet of the existing Lot 12 Prior to PUD Development <br /> rear lot line shall not exceed one stow and 25 feet in height; Plan approval. <br /> <br />· A 165~foot-wide open-space band shall be permanently maintained along Prior to final subdivision map <br /> the south end of Lot 12. An open-space easement shall be granted over approval. <br /> this area to the City at the time of final subdivision map recordation <br /> which restricts the use and improvements to livestock grazing, open <br /> fencing, underground infrastructure facilities, and storm-water drainage <br /> facilities. Solar collectors, dog runs, play structures and private roads <br /> shall specifically not be permitted within this area. A land management <br /> <br />Vineyard Avenue Corridor Specific Plan Draft EIR MMP-18 Mitigation Monitoring Plan <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.