My WebLink
|
Help
|
About
|
Sign Out
RES 99075
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1999
>
RES 99075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:44:18 PM
Creation date
6/15/1999 4:57:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MONITORING PLAN <br /> <br /> Impact / Specific Plan Measure Tim_ing <br /> <br /> plan shall be prepared to establish private responsibility for permanently <br /> maintaining this open space land; <br /> <br />· Future buildings located to the north of the northerly boundary of the Prior to PUD Development <br />open space easement shall be constructed at least 40 feet north of the Plan approval. <br />easement; and <br /> <br />~ Grading on the ridge and north-facing slope of Lot 12 shall be carefully Prior to PUD Development <br /> engineered to create natural and not geometric contours, with no slope Plan approval. <br /> exceeding a 3:1 grade. <br /> <br />4.10-3: Visual Changes in Subarea 3 <br /> <br />Although significant visual impacts would not be anticipated in Subarea 3, the <br />following additional standards shall apply to Lots 22 and 23 in order to <br />minimize the effects of development along Vineyard Avenue: <br /> <br />~ Buildings on lots which abut Vineyard Avenue shall not exceed one story Prior to PUD Development <br /> and 25 feet in height; Plan approval. <br /> <br />, A continuous open space band of at least 30 feet in width (to be precisely Prior to PUD Development <br /> determined at PUD development plan approval) shall be maintained Plan approval. <br /> between the southern right-of-way line of the existing Vineyard Avenue <br /> and any future fencing on Lots 22 and 23. <br /> <br /> An open-space easement over this area shall be deeded to the City at the Prior to final subdivision plan <br /> time of final subdivision map recordation which restricts the use of this approval. <br /> area to landscape planting and irrigation, infrastructure facilities, and <br /> storm water drainage facilities. No fencing shall be permitted within this <br /> area. A coordinated landscape and irrigation plan shall be designed for <br /> this area to screen the views of homes from outlying areas to the north. <br /> A landscape management plan shall be prepared to establish private <br /> responsibility for permanently maintaining landscape materials within this <br /> area. <br /> <br /> A coordinated fencing plan shall be prepared for the area immediately Prior to PUD Development <br /> south of the southern edge of the open space band. Future buildings to Plan approval. <br /> the south of the open space band shall be located at least 30 feet back <br /> from the southern edge of the band. <br /> <br />4.10-4: Visual Changes in the Circulation System <br /> <br />Although significant visual impacts would not be anticipated with the proposed Required as condition of <br />circulation system, the following additional standards shall apply in order to tentative subdivision map <br />minimize the effects of development contiguous with Vineyard Avenue. approval. <br /> <br />· A minimum six-foot-high landscaped earth berm shall be constructed <br /> along the Vineyard Avenue frontage of Lots 4, 9, 10, 11 and 13 (and Lot <br /> 8 if desired for the owner of this developed parcel); and a decorative <br /> masonry soundwall with landscaping shall be developed along the <br /> <br />Vineyard Avenue Corridor Specific Plan Draft EIR MMP-19 Mitigation Monitoring Plan <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.