Laserfiche WebLink
MITIGATION MONITORING PIAN <br /> <br /> Impact / Specific Plan Measure Timing <br /> <br /> In graded construction areas, permanent replacement vegetation shall <br /> be planted as quickly as possible, properly irrigated and maintained in <br /> health growing condition. Graded areas that remain inactive for ten <br /> days or more during the rainy season (i.e., October 1 to April 1) <br /> without permanent replanting should be hydroseeded or stabilized to <br /> inhibit dust. <br /> <br />· All trucks hauling excavated materials shall be covered with <br /> tarpaulins or other effective covers. <br /> <br /> All unpaved access roads, parking areas, and staging areas at <br /> construction sites shall be rocked, watered three times daily, or <br /> covered with non-toxic soil stabilizers. <br /> <br />· Traffic speed on unpaved roads shall be limited to 15 miles per hour. <br /> <br />· Reactive organic gas (ROG) emissions from adhesives, clean-up <br /> solvents, paint, and asphalt paving materials used during project <br /> construction shall be reduced by using materials with a low ROG <br /> content, in compliance with Bay Area Air Quality Management <br /> District standards. <br /> <br /> The existing speed limit on Vineyard Avenue between Bemal Avenue <br /> and Montevino Drive shall be reduced from 40 mph to 35 mph in <br /> order to reduce traffic noise levels. <br /> <br />4.6-3: Regional Emissions <br /> <br />The following mitigation measures are incorporated into the proposed project <br />to reduce regional project-generated air emissions: <br /> <br />· The project site should be linked to the local transit system along the Required as a condition of <br /> realigned Vineyard Avenue and school loop street system and PUD Development Plan <br /> provided with bus stop pull-outs and pedestrian shelters at the approval. <br /> community park, school and applicable local street intersections along <br /> the realigned Vineyard Avenue. <br /> <br />- The installation of energy-efficient heating and cooling systems, and Construction plans to <br /> energy efficient lighting shall be required in all residential, demonstrate conformance <br /> commercial, and school construction. prior to issuance of building <br /> permit. <br /> <br />· Only EPA-approved fireplaces and wood buming stoves shall be Construction plans to <br /> installed in residential units. demonstrate conformance <br /> prior to issuance of building <br /> permit. <br /> <br /> Vineyard Avenue Corridor Spedfie Plan Drab EIR MMP-13 Mitigation Moniloring Plan <br /> <br /> <br />