Laserfiche WebLink
MITIGATION MONITORING PLAN <br /> <br /> Impact / Specific Plan Measure Timing <br /> <br />4.6-4: Operational Emissions From On-Site RMC Lonestar Gravel <br /> Harvesting Activities <br /> <br />Site grading, excavation and construction activities associated with already <br />permitted aggregate mining on the project site could result in significant air <br />quality impacts for the duration of the mining activity. Because this activity is <br />already a permitted use, mitigation beyond that required by the 1981 <br />Livermore-Amador Valley Quarry Reclamation Specific Plan would not be <br />feasible to impose as part of this project. The Specific Plan proposes to replace <br />between 20 and 30 acres of permitted aggregate mining area with homes and <br />vineyards. <br /> <br />TRANSPORTATION and CIRCULATION (Section 4.7) <br /> <br />4.7-5: Bernal Avenue Arroyo del Valle Bridge <br /> <br />Project applicants shall contribute the pro-rata Plan Area cost-share funding Upon determination of need <br />(through participation in the City Transportation Impact Fee) to construct a by the City of Pleasanton. <br />second bridge for Boreal Avenue to cross Arroyo del Valle, if and when the <br />City determines that such a bridge is necessary. The City would be responsible <br />for building the bridge if it becomes necessary.. <br /> <br />PUBLIC SERVICES (Section 4.8) <br /> <br />Fire Protection <br /> <br />4.8-1b: Exposure to Wildland Fire Risks <br /> <br />New homes surrounded by Open Space land shall be protected through the use Construction plans to <br />of fire breaks, removal of any vegetation and other material presenting demonstrate conformance <br />potential fire hazards, and use of fire-retardant vegetation. prior to issuance of bu~ding <br /> permit. <br /> <br />Emergency vehicle access shall be provided to Open Ppace areas as identified Construction plans to <br />by the LPFD. tentative subdivision map <br /> approval. <br /> <br />All residences located in areas with slopes greater than 15% shall be accessible Construction plans to <br />from driveways designed to accommodate firefighting equipment. Driveways demonstrate conformance <br />shall be a minimum of 16 feet wide and 20 feet clear. Driveways exceeding 150 prior to issuance of building <br />feet shall be designed to allow a fire truck to turn around. permit. <br /> <br />4.8-1c: Provision of Fire Flow <br /> <br />All homes located above elevation 540 shall be provided with an elevated Construction plans to <br />onsite water storage tank (minimum 1,000 gallon capacity) subject to approval demonstrate conformance <br />by the LPFD, to ensure adequate pressure for domestic use, fire sprinklers, and prior to issuance of building <br />other approved fire systems. permit. <br /> <br />Vineyard Avenue Corridor Specific Plan Draft EIR MMP-14 Mitigation Monitoring Plan <br /> <br /> <br />