Laserfiche WebLink
MITIGATION MONITORING PLAN <br /> <br /> Impact / Specffic Plan Measure Timing <br /> <br /> shall provide full disclosure of the potential future mining operations within the <br /> Specific Plan Area. <br /> <br />4.5-4: Noise Effects of Gravel Harvesting Operations <br /> <br /> Specific Plan measure 4.5-3 (above) shall be implemented to also minimize Required as a condition of <br /> noise levels on the project site from offsite gavel harvesting operations. tentative subdivision map <br /> approval and implemented at <br /> close of escrow. <br /> <br />4.5-5: Traffic Noise Effects <br /> <br />A minimum six-foot high landscaped earth berm shall be constructed along the Required as a condition of <br />Vineyard Avenue frontage of Lots 4, 9, 10, 11, and 13 (and Lot 8, if desired by subdivision map approval. <br />the owner of this developed parcel), and a decorative masonry soundwall and <br />landscaping shall be constructed along the Vineyard Avenue frontage of Lot 1 <br />and be designed to complement the existing soundwall and landscaping on the <br />north side of Vineyard Avenue. <br /> <br />All new two-story homes constructed less than 140 feet from the centerline of Required as a condition of <br />the re-aligned of Vineyard Avenue shall have a fresh air ventilation and/or air PUD Development Plan <br />conditioning system to allow residents to maintain closed windows for noise approval. <br />control. <br /> <br />Potential bed and breakfast inn facilities shall be designed to ensure that Required as a condition of <br />interior noise levels of the occupied rooms are less than 45 dBA La~- Dual- PUD Development Plan <br />paned windows shall be required for all rooms with a view of Vineyard Avenue. approval. <br />Because windows must remain closed to obtain the required noise reduction, <br />mechanical ventilation (e.g., air conditioning) shall be provided for all rooms. <br />A Title 24 analysis shall be required during the design phase to determine the <br />potential need for additional noise control measures. <br /> <br />AIR QUALITY (Section 4.6) <br /> <br />4.6-1: Construction-Related Air Emissions <br /> <br />Site grading, excavation, and general construction activities could result in During grading and <br />temporarily significant air quality impacts. To mitigate this impact, the construction. <br />Specific Plan air quality mitigation measures shall be implemented at all <br />construction sites in accordance with BAAQMD Basic and Enhanced Control <br />Measures. The specific controls included in the Specific Plan are as follows: <br /> <br /> During the construction period, all active unpaved construction areas <br /> shah be watered at least twice daily or treated with non-toxic soil <br /> stabilizers in order to avoid dust. Exposed stockpiles of dirt or sand <br /> shall be enclosed, covered, watered twice daily, or treated with non- <br /> toxic soil binders. <br /> <br />· If soil material is carried on public or private roads, such roads shall be <br /> swept daily with water sweepers to control dust, where applicable. <br /> <br />Vineyard Avenue Corridor Specific Plan Draft EIR MMP-12 Mitigation Monitoring Plan <br /> <br /> <br />