My WebLink
|
Help
|
About
|
Sign Out
RES 99075
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1999
>
RES 99075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 12:44:18 PM
Creation date
6/15/1999 4:57:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MONITORING PLAN <br /> <br /> Impact / Specific Plan Measure Timing <br /> <br />Mitigation Measure 4.4-4 shall be implemented to reduce impacts on <br />California tiger salamander habitat. <br /> <br />4.4-8: Arroyo del Valle <br /> <br />To protect the ripafian habitat associated with the Arroyo del Valle, a 100-foot Prior to issuance of ~ading <br />setback shall generally be established from the top of the south bank of the permit in applicable areas. <br />Arroyo del Valle. No development or construction activities other than <br />detention basins and trails shall be allowed within the setback area. The trails <br />shall be setback as far as possible from Arroyo del Valle to minimize <br />disturbance by people and maximize habitat values. Construction project <br />fencing shall be placed at the outer edge of the setback area. The fencing shall <br />be maintained unt~ all construction activities are completed. The setback <br />requirement for trails shall also apply to other riparian corridors within Specific <br />Plan Area. <br /> <br />NOISE (Section 4.5) <br /> <br />4.5-1: Noise from Construction Activities <br /> <br />Construction of housing, roads, other infrastructure, and other site During construction. <br />improvements shall be limited to the hours of S:00 a.m. to 5:00 p.m., Monday <br />through Saturday. <br /> <br />4.5-2: Stationary Source Noise Generated by Development <br /> <br />The loudness of school bells and outdoor speakers should be minimized to During school operation. <br />reduce impacts on surrounding residents. <br /> <br />4.5-3: Noise Effects of Gravel Processing Operations <br /> <br />All new two-story homes constructed less than 140 feet from the centerline of Required as a condition of <br />the realigned Vineyard Avenue, and all new homes where projected noise PUD Development Plan and <br />levels exceed an L~. of 55 dBA (Lots 8, 9, 13, 15, 18, 19, 20, 21, 26, 27 and building permit approval. <br />28) shall be constructed with a fresh-air ventilation and/or air conditioning <br />system that allows residents to maintain closed windows for noise and dust <br />control. All windows facing the RMC Lonestar plant shall be dual-paned. <br />Other Mitigation Measure may also be necessary depending upon the locations <br />of homes (i.e., berms, landscaping, dual siting strategies). <br /> <br />The recorded deed of sale for all lots shall include a clause which states that Required as a condition of <br />the property is in an area subject to excessive noise, dust, and vibration levels tentative subdivision map <br />from gavel harvesting and processing and that the City of Pleasanton is not approval. <br />liable for possible damages due to such impacts. <br /> <br />All lots within the Specific Plan Area shall include a noise/dust/vibration Required as a condition of <br />easement in the recorded deed of sale. In addition, a separate disclosure tentative subdivision map <br />statement shall be provided to prospective purchasers and tenants by lot approval and implemented at <br />owners, developers, and future successors in interest. The disclosure statement close of escrow. <br /> <br />Vineyard Avenue Corridor Specific Plan Draft EIR MMP-11 Mitigation Monitoring Plan <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.