My WebLink
|
Help
|
About
|
Sign Out
SR 06:144
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:26 AM
Creation date
5/12/2006 11:26:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:144
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />was defmed as Phase I work, and provides for improvements upstream of Adams Way and <br />does not include a steel bridge across from Sherry Court. Below is a table that defines four <br />potential project funding levels for consideration based on the low bid received and <br />corresponding additive/deductive bid items for the various options. (Note: The low bidder, <br />Hanford Applied Restoration, also provided competitive low bids for the alternative, optional <br />items of work.) <br /> <br />o tion 1, Construct Phase I onl <br />Construction Costs: Phase I, is east of Adams Way, and provides for the <br />removal of invasive species, the installation of landscaping, the <br />replacement of the irrigation system, and the regrading of the creek with <br />minor esthetic treatment at the Sherry Court Bridge location (cosmetic <br />treatment, no steel bridge). Includes minor 8' X 10' wooden low flow <br />brid eat icnic area. <br />Contin enc 10%: <br />Construction Services: <br />TOTAL <br /> <br />$847,256.24 <br /> <br /> <br />$85,000.00 <br />$45,000.00 <br />$977,256.00 <br /> <br />Option 2, Construct Phase I and II with no steel brid2es <br />Construction Costs: Phase I is east of Adams Way, and provides for the $847,256.24 <br />removal of invasive speCIes, the installation of landscaping, the <br />replacement of the irrigation system, and the regrading of the creek with <br />minor esthetic treatment at the Sherry Court Bridge location (cosmetic <br />treatment, no steel bridge). Includes minor 8' X 10' wooden low flow <br />bridge at picnic area. <br />Construction Cost: Phase II is downstream of Adams Way (west), and $180,557.33 <br />provides for the removal of invasive speCIes, the installation of <br />landscaping, the replacement of the irrigation system, and the regrading <br />of the creek. <br />Contin/!encv (10%): $103,000.00 <br />Construction Services: (survey staking, material testing, soil sampling) $45,000.00 <br />TOTAL $1,175,814.00 <br /> <br />SR 06:144 <br />Page 3 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.