My WebLink
|
Help
|
About
|
Sign Out
SR 06:144
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2006 11:33:26 AM
Creation date
5/12/2006 11:26:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/16/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:144
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Option 3, Construction of Phase I & II with one steel <br />brid2e <br />Construction Costs: Phase I is east of Adams Way, and $847,256.24 <br />provides for the removal of invasive species, the installation of <br />landscaping, the replacement of the irrigation system, and the <br />regrading of the creek with minor esthetic treatment at the <br />Sherry Court Bridge location. Includes minor 8' X 10' <br />wooden low flow bridge at picnic area. <br />Construction Costs: Phase II is downstream of Adams Way $180,557.33 <br />(west), and provides for the removal of invasive species, the <br />installation of landscaping, the replacement of the irrigation <br />system, and the regarding of the creek. <br />Construction Costs: Steel Bridge at Cabernet Court. $123,338.92 <br />Contin/!encv (10%): $115,000.00 <br />Construction Services: (survey staking, material testing, soil $45,000.00 <br />sampling) <br />TOTAL $1,311,152.00 <br /> <br />o tion 4, Construction of entire ro'ect (two steel brid es) <br />Construction Costs: Phase I, is east of Adams Way, and <br />provides for the removal of invasive species, the installation <br />of landscaping, the replacement of the irrigation system, and <br />the regrading of the creek. Includes minor 8' X 10' wooden <br />low flow brid e at icnic area. <br />Construction Costs: Phase II is downstream of Adams Way <br />(west), and provides for the removal of invasive species the <br />installation of landscaping, the replacement of the irrigation <br />s stem, and the re ardin of the creek. <br />Construction Costs: Steel Brid e at Cabernet Court <br />Construction Costs: Steel Brid e at Sher Court (+ demo) <br />Contin enc 10%: <br />Construction Services: (survey staking, material testing, soil <br />sam lin ) <br />TOTAL <br /> <br />$811,729.75 <br /> <br />$180,557.33 <br /> <br />$123,338.92 <br />$173,368.80 <br />$128,000.00 <br />$45,000.00 <br /> <br />$1,461,994.80 <br /> <br />SR 06:144 <br />Page 4 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.