Laserfiche WebLink
On-Site Operations <br /> <br />64. All existing wells on the site shall be removed or sealed. filled and abandoned pursuant to <br /> Alameda County Ordinance 73-68, prior to the start of grading operations unless Zone 7 <br /> retains specific wells for observation wells, or special approval is obtained from the City <br /> Engineer for temporary use of an existing well for construction water. Any ;,veils <br /> designated for abandonment or any wells, encountered during construction, are to be <br /> destroyed in accordance with a permit obtained from Zone 7. <br /> <br />65. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br /> abandoned, pursuant to the requirements of the Alameda County Department of Health <br /> Services. <br /> <br />66. The developer's contractor(s) shall obtain an encroachment permit from the City Engineer <br /> prior to moving any construction equipment onto the site. <br /> <br />67. Any damage to existing street improvements during construction on the subject property <br /> shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br /> This shall include slurry seal, overlay, or street reconstruction if deemed warranted by the <br /> City Engineer. <br /> <br />68. The haul route for all materials to and from this development shall be approved by the <br /> City Engineer prior to the issuance of an encroachment permit. <br /> <br />69. The applicant shall submit a construction Best Management Practices (BMP's) program <br /> for review and approval by the Planning Director prior to issuance of building and/or <br /> grading permits. These BMP's shall be implemented by the general contractor and all <br /> subcontractors and suppliers of materials and equipment. Construction site cleanup and <br /> control of construction debris shall also be addressed. Failure to comply with the <br /> approved construction BMP may result in the issuance of correction notices, citations, or <br /> a stop work order. <br /> <br />70. The applicant is responsible for implementing the following measures during all <br /> construction phases of the project: <br /> <br /> a. Gather all construction debris on a regular basis and place it in a dumpster or <br /> other container which is emptied or removed an a weekly basis. When appropriate, use <br /> tarps on the ground to collect fallen debris or splatters that could contribute to storm <br /> water runoff pollution. <br /> b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br /> and storm drains adjoining the site. Limit construction access routes onto the site and <br /> place gravel on them. Do not drive vehicles and equipment off paved or graveled areas <br /> during wet weather. Broom sweep the street pavement adjoining the project site on a <br /> daily basis. Scrape caked-on mud and dirt from these areas before sweeping. <br /> <br />Case Z-9 7-3 10 Page 'B- 10 Conditions of Approval <br /> <br /> <br />