My WebLink
|
Help
|
About
|
Sign Out
RES 98032
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1998
>
RES 98032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 2:45:39 PM
Creation date
1/8/1999 4:29:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/7/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building permits and the type of remote control mechanism shall be identified. <br /> <br />-. 57. The applicant shall seek City Council approval to allow on-site regulation of the Vehicle <br /> Code for the parking lot. <br /> <br /> ENGINEER/NG <br /> <br /> Grading and Drainage <br /> <br /> 58. The developer shall submit a final grading and drainage plan prepared by a licensed civil <br /> engineer depicting all final grades and on-site drainage control measures, including <br /> concrete-lined V-ditches, to protect all cut and fill slopes from surface water overflow. <br /> This plan shall be subject to the review and approval of the City Engineer and/or the <br /> Director of Building Inspection prior to the issuance of any building permits. <br /> <br /> 59. The developer shall submit an erosion and sedimentation control plan or procedure as <br /> part of the final grading and/or improvement plans. The applicant is responsible for <br /> ensuring that the contractor is aware of and implements such measures. No grading shall <br /> occur between October 15 and April 15 unless approved erosion control/storm water <br /> quality measures are in place, subject to the approval of the City Engineer/Director of <br /> Building Inspection. Such measures shall be maintained until such time as permanent <br /> landscaping is in place. All cut and fill slopes shall be revegetated and stabilized as soon <br /> as possible after completion of grading, but in no case later than October 15th. <br /> Hydroseeding shall be accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the grasses are established before October 15. <br /> <br /> 60. The developer shall submit a reldable cash bond for hazard and erosion control prior to <br /> issuance of an Engineering or Building Department permit. The amount of this bond will <br /> be determined by the City Engineer. <br /> <br /> 61. The developer shall submit a dust control plan or procedure as part of the improvement <br /> plans, subject to the approval of the City Engineer. <br /> <br /> 62. Approval of the storm drainage system shall be subject to the review and approval of the <br /> City Engineer. The applicant is encouraged to use parking lot landscape areas as <br /> vegetative filter strips for clean stormwater run-off purposes. If filter strips are deemed to <br /> be infeasible, the applicant shall install in the new parking lot fossil filter separators <br /> pursuant to condition #71 and shall re-address the use of concrete curbs within the <br /> parking lot, subject to the review and approval of the Planning Director. <br /> <br /> Utilities, Lighting, Landscaping <br /> <br /> 63. All utilities required to serve any existing or proposed development on-site shall be <br /> installed underground, unless otherwise determined by the City Engineer. <br /> <br /> Case Z-97-310 Page B-9 Conditions of Approval <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.