Laserfiche WebLink
c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt flowing <br />-. in the storm drain system. Maintain and/or replace filter materials to ensure effectiveness <br /> and to prevent street flooding. <br /> d. Create a contained and covered area on the site for the storage of bags, cement, <br /> paints, oils, fertilizers, pesticides, or other materials used on the site that have the <br /> potential of being discharged into the storm drain system through being windblown or in <br /> the event of a material spill. <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers'into a street. <br /> gutter, or storm drain. <br /> f. Ensure that concrete/gunite supply tracks or concrete/plaster operations do not <br /> discharge wash water into street, gutters, or storm drains. <br /> <br /> Urban Clean Water Run-Off <br /> <br /> 71. The applicant shall comply with the City's non-point storm water discharge ordinance. <br /> <br /> 72. If vegetative filter strips are infeasible, or the amount of m-off is deemed to be too great <br /> to be accommodated solely by the filter strips, the applicant shall install a structural <br /> control, such as an oil/water separator, sand filter, or approved equal in the parking lot to <br /> intercept and pretreat storm water prior to reaching the storm drain. The design, <br /> locations, and a schedule for maintaining the separator shall be submitted to the City <br /> Engineer/Director of Building Inspection for review and approval prior to issuance of <br /> building permits. The structural control shall be cleaned at least twice a year: once <br /> immediately prior to October 15 and once in January. The applicant shall enter into a <br /> maintenance agreement for the oil/water separator. <br /> <br /> 73. The new trash enclosure area shall be completely covered. An area drain shall be <br /> installed in any new enclosure area which connects to the sanitary sewer. A structural <br /> control such as an oil/water separator or sand filter shall be provided for any new <br /> enclosure. No other area shall drain into the trash enclosure; a berm shall be installed to <br /> prevent such drainage if found necessary by the City Engineer/Director of Building <br /> Inspection. A sign shall be posted prohibiting the dumping of hazardous materials into <br /> the sanitary sewer. The applicant shall notify the Dublin-San Ramon Services District <br /> (DSRSD) upon installation of the sanitary connection; a copy of this notification shall be <br /> provided to the Planning Department. <br /> <br /> 74. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br /> month and shall prevent the accumulation of litter and debris on the site. Comers and <br /> hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br /> pressure washed, debris must be trapped and collected to prevent entry into the storm <br /> drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br /> agent or degreaser is used, wash water must be collected and discharged to the sanitary <br /> <br /> Case Z-9 7-3 10 Page B-11 Conditions of Approval <br /> <br /> <br />