Laserfiche WebLink
K. Yri or to issua~ice of a building peranit, the project developer shall pay the applicable Zone 7 and <br />City connection lees and water meter cost For any water anetcrs, including irrigation meters. <br />Additionally, the project developer shall pay any applicable Dublin San Ramon Services District <br />(DSRSIJ) sewer permit fee. <br />9. The project developer acknowledges that the City of Yleasan ton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of'this case, <br />and that the project developer agrees and acknowledges that building permit approval araay be <br />withheld iF sewer capacity is found by the City not to he available- <br />1 O. "this approval does not guarantee the availability of sufrcient water to serve the project The <br />City shall withhold building peranits for the project if at the time building perrnits are applied for, <br />n~aandatory water rationing is in effect, unless the City has adopted a water o£fsct prograan and <br />unless the project developer is participating in. the program. Notwithstanding the project <br />developer's participation in such a prograxra, the City nzay withhold building permits if the City <br />determines that sufficient water is not available at the time of application of building permits. <br />1 1 . The building peniait plan check niateri als will be accepted for submittal only after completion of <br />the fifteen- (1 5) day appeal period, measured froxra the date oFthe approval letter, unless the <br />project developer submits a signed statement acknowledging that the plait check fees niay be <br />forfeited in the event that the approval is overturned on appeal, or that the design is signilicantly <br />changed as a result of the appeal. In no case will a building permit be issued prior to the <br />expiration of the fiReen <15) day time-period. <br />12. "1'he project developer shall use their best efforts to implement the measures identified in the U.S. <br />Green Building Council's ~U SGBC), "i,eadership in Energy Environmental Design (Lr;EDTM )" <br />2.0 rating system in the design, construction, and operation of the proposed building, including <br />all future; tenant improverracnts_ Before issuance of a building pern-xit, the LEED ~ M x-neas ures <br />detailed in 1=;xhibit "A", dated "Received July 25, 2005" and approved by the Planning <br />Commission shall be explicitly caned out a separate sheet of the building permit plan set and <br />shall be subject to review by the Planning Director- <br />1 3. Prior to the final inspection, the project developer shall install a bench~s~ and ashtray/ waste <br />receptacle in the designated smoking area at a distance of no less thaai 20 ft., or as required by <br />State Law, fro n~a the building entrance. "Phis change shall he shown on the building permit plait <br />Set submit tc;d fc>r review and appro veil prior tc> the issuatce c~Fa building penrait_ <br />1 4. Prior to the issuance of a building permit, the applicant shall review the site plan to show the <br />number of carpool spaces provided on campus is in conformance to the Hacienda Design <br />Guidelines. This change shall be included on the. construction drawings submitted for plan check <br />and perrraits_ <br />15. "1'hc public art piece on the site shall be installed prior to building final The design of the public <br />art piece shall he subject to the review and approval by the City's Civic Arts Commission prior <br />to installation- <br />