Laserfiche WebLink
8. '7'he approved building, n~xateri als sa ,-xd colors shall be stated on the building permit plrrns to <br />the satisfaction of-the Planning Director_ Substitutions shall not be allowed unless <br />otherwise approved by the Planning Director. <br />rJ_ All site improvexrLents and house construction activities shall be limited to the hours of <br />R:00 a._rrL_ Lo 5:00 p.n~x_, Monday through Friday. All construction eq uiprrxcnt must nicct <br />Depzartxnent of Motor Vehicles (DMV) noise siatt lords and shall be equipped. with <br />muffling, devices. <br />Building <br />1 O. Obtain a building penrxit from the Building Department and any other applicable City <br />perr-n its for the project. prior to the commencement of any construction_ <br />1 7 . Prior to final building permit inspection, the Planning Departrrxcnt shall conduct a <br />final inspections of the structures), grading, and the preservation of the existing trees_ <br />7. 2. lluring Construction, the project developer is responsible for implementing the <br />following measures: <br />a_ Portable toilets shall be kept as far as possible from existing residences a.a~d <br />shall be emptied on a regular basis as necessary to prevent odor. <br />b. Gather all construction debris on a regular basis and place it in a dumpster or <br />other container which is emptied or removed oa a weekly basis. When <br />appropriate, use tarps on the ground Lo collect fallen debris or splatters that <br />could contribute to storm water runoff poll ution. <br />c. Remove all dirt, gravel, rubbish, refuse, and green waste front the street <br />pavement and storm drains ac~j Dining the site_ Liniit construction access <br />routes onto the site and place gravel on then~r_ Do not drive vehicles axxd <br />equipment off paved or graveled areas during wet weather. Broom-sweep the <br />street pavement adjoining the project site on a daily basis. Scrape eal<ed-on <br />mud and dirt front these areas before sweeping. <br />d. Install -li ltcr tt~ateri als (such as sandbags, filter fabric, etc.) ai Lhe stcrrn~r drain <br />inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt i-]owing in the storx2~ drain systen-i_ Maintain and/or replace Filter <br />materials to ensure effectiveness and to prevent street f7ooding_ <br />e_ Crcatc a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pcsti ciders, or other materials used on the site <br />Lhat have the potential of being discharged into the storm drain system through <br />being, windblown or in the event of a material spill_ <br /> <br />