My WebLink
|
Help
|
About
|
Sign Out
PC 2005-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2005
>
PC 2005-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:28:17 PM
Creation date
3/1/2006 4:33:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/9/2005
DOCUMENT NO
PC 2005-08
DOCUMENT NAME
PUD-42
NOTES
BACH AND LAMB
NOTES 3
4 LOT DEVELOPMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and approval by the Planning Director before installation and shall be installed in <br />conjunction with the construction of the sidewalk from Sycatriorc Terrace to San Carlos <br />Way. <br />The project developer shall submit the revised guidelines to the I Tanning Director for review and <br />approval before the City's approval of the tentative parcel map. <br />General Conditions: <br />16. The project developer shall obtain a Building Permit from the Building Department and <br />any other applicable City permits for the project prior to the commencement of any <br />construction. <br />1 7. The project developer shall pay any and all fees including the applicable Zone 7 drainage <br />Fees to which the property may be subject prior to issuance of building permits. The type <br />and amount of the fees shall be those in effect at the time the building permit is issued. <br />18. The project developer shall work with the Pleasanton Unified School District and the <br />City Planning Director to develop a program, in addition to the school impact fees <br />required by State law and local ordinance, to off-set this project's long-term effect on <br />school facility needs in Pleasanton. This program shall be designed to fund school <br />facilities necessary to offset this project's reasonably related effect on the long-term need <br />for expanded school facilities to serve new development in Pleasanton. The method and <br />manner for the provision of these funds and/or facilities shall be approved by the City and <br />in place prior to issuance of building permits In no event shall construction commence <br />unless the above method and manner for the provision of these funds and/or facilities has <br />been approved by the C:ity_ <br />7 9. This PUD development plan shall be of no further validity and the project developer shall <br />be required to submit the same or new development plan for City approval prior to the <br />development of the site in the event that the project developer fails to record a final map <br />within two years of PUD approval. <br />20. The project developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case;, and that the project developer agrees and acknowledges that building permit <br />approval niay be withheld if sewer capacity is found by the City not to be available. <br />21. This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. <br />Notwithstanding the project developer's participation in such a program, the City may <br />withhold building permits if the City determines that sult3cient water is not available at <br />the time of application of building permits. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.